My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
81-071
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
1980-1989
>
1981
>
81-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:31:38 AM
Creation date
5/27/2014 1:41:13 PM
Metadata
Fields
Template:
General
Document
Resolution 81-71
General - Type
Resolution 81-71
Category
Resolution 81-71
Date
10/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, the City's Sewage Pumping Station No. 2 in <br />District W will have to be rebuilt by 1983 if the prajected flows <br />from District NC shown above occur, and <br />WHEREAS, the Metropolitan Waste Control Commission (the <br />'°MWCC") has stated that it supports the joint use of inplace <br />sanitary sewer facilities and has determined a proposed diversion <br />of sanitary sewers from the City's District NC through New <br />Brighton will not overload the present Metropolitan interceptor <br />or have an adverse imgact on the Metropolitan Wastewater Treat- <br />ment plant, and <br />WHEREAS, the City believes the existing 42 inch trunk <br />sewer in New Brighton and the extension thereof to the City's <br />corporate limits meets the criteria set forth by the Metropolitan <br />Council and may qualify as a Metropolitan interceptor sewer, and <br />WHEREAS, the City has been advised by representatives of <br />New Brighton that excess capacity amounting to four (4) cubic <br />feet per second is available in New Brighton's 42 inch trunk <br />sanitary sewer, and <br />WHEREAS, the City of New Brighton has indicated it would <br />make the aforesaid excess capacity available to the City, <br />NOW, THEREFORE, IT I5 HEREBY RESOLVED by the City Council <br />of the City of Arden Hills that the City hereby respectfully <br />requests of the Metropolitan Council: <br />1. That the Metropolitan Council accept a certi- <br />fied copy of this Resolution and refer the same <br />to the MWCC for its review and recommendation <br />back to the Metropolitan Council; <br />2. Upon favorable recommendations from the MWCC to <br />the Metropolitan Council, the Metropolitan <br />Council: <br />(a) Approve as soon as possible the City`s <br />Plan B for diverting sewage from the <br />City's District NC into New Brighton so <br />that the City can proceed with its <br />contemplated improvements of Sewage <br />Pumping Station No. 2; and <br />(b) Authorize the MWCC to acquire New <br />Brighton's 42 inch interceptor sewer and <br />to extend the interceptor to the City's <br />westerly corporate limits by 1984; and <br />3. The Metropolitan Council approve the City's <br />proposal of a New Brighton connection and <br />' consider this approval as a modification of the <br />City's CSPP. <br />Passed by the Arden Hi11s City Council this � day of <br />October, 1981. <br />�% � ��� �.�� <br />�..- .... . <br />Attest: <br />� �-�7i� . <br />Charlotte McNiesh, <br />Clerk-Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.