My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
07-14-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2014 9:48:59 AM
Creation date
7/11/2014 9:48:54 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As proposed, the buildings would be constructed with tip-upconcrete panels with decorative <br />accents that incorporate brick and metal to help offset the large façades of the structures. The <br />applicant is also proposing to use a large amount of glass on the front of the buildings to further <br />enhance the attractiveness of both buildings.The front façade of building 1 is positioned to face <br />I-35W/I-694 and building 2 has its front oriented towards Gateway Boulevard. In order to <br />provide functional space that will serve the needs of both large and small tenants,building 1 is <br />proposedwithtwenty-five (25) foot to thirty (30) foot sidewallsand building 2 with twenty (20) <br />foot to twenty-five (25) foot sidewalls. <br />Surface parking would be provided on the site as depicted on the site plan that has been <br />submitted by the applicant. The plan shows that the parking needs for this development can be <br />accommodated onsite. Preliminary figures show that 364 parking spaces are required and 382 <br />spaces have been provided.Access to the site has been provided off of Gateway Boulevard in <br />threelocations, two of which have been designed to serve both passenger vehicles and semi- <br />truck traffic. <br />The applicant has provided a narrative of the proposed use (Attachment A), a site plan <br />(Attachment B) and elevations examples (Attachment C). <br />ExistingTraverse Business Center PUD <br />The City Council approved the Traverse Business Center Planned Unit Development (PUD)in <br />July of 2007. This particular PUD called for three (3) phases of development. Phase I consisted <br />of a 203,400 square foot six (6) story office building. Phase II added an additional 261,600 <br />square foot office building with eight (8) stories. The remaining phase IIIconsisted of a 30,000 <br />square foot office building.Phase I andII have both Master PUD approval and Final PUD <br />approval. Phase III only has a Master PUD approval at this time. As stated in thecurrentPUD <br />Permit,building permits for Phase I and Phase II are required to be obtained on or before July <br />30, 2014, to keep the PUD from expiring. <br />The existing PUD for the Traverse Business Center can bereviewed in Attachment Dalong with <br />the landscaping plan and colored elevations of the proposed structures. <br />Attachments <br />A.Narrative <br />B.Site Plan <br />C.Elevation examplesprovided by Roberts Management Group <br />D.Existing Traverse Business Center PUD <br />E.Existing PUD Landscaping Plan and Elevations <br />City of Arden Hills <br />City Council Work Session for July 14, 2014 <br />P:\\Planning\\Planning Cases\\2014\\PC 14-023 -Concept Review -Traverse Business Center -Nick Roberts\\Memos_Reports_14-023 <br />22 <br />Page of <br />
The URL can be used to link to this page
Your browser does not support the video tag.