My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
07-28-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2014 11:43:40 AM
Creation date
7/25/2014 11:42:42 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Traffic Forecasts <br />The No Build Year 2030 background traffic forecasts were previously prepared for the Draft TCAAP <br />Figure T10 <br />Redevelopment. shows the peak hour turning movement volumes. Traffic forecasts for <br />the year 2030 that include the TCAAP project traffic were developed by adding the project site <br />generated trips to the future year 2030 background traffic forecasts. Project specific trip generation <br />estimates for the AM and PM peak periods were calculated for each proposed development scenario <br />based on the proposed land use type and size. Trip generation rates from the 9th Edition of the <br />Institute of Transportation Engineers Trip Generation were used to calculate development-generated <br />traffic. A number of assumptions were made related to internal trip capture (trips that are made on- <br />site between the various proposed uses), pass-by trips (trips already existing within the study area <br />that make use of the proposed TCAAP development land uses), and mode split (trips by transit, <br />walking, or biking). The trip reductions were based on typical rates found in the general project area, <br />United States Census data, and commuter surveys that showed a reduction of approximately 15 <br />percent of trips due to transit, multi-use, pass-by and internal capture rates. <br />7. Trip Generation <br />A summary of the Minimum and Maximum Development Scenario trip generation calculations for the <br />Table 5Table 6 <br />AM and PM peak hours are shown in and . <br />Table 5 Minimum Development Scenario Trip Generation <br />Minimum Development Scenario <br />AM PM PM <br />Total Daily AM AM PM <br />Use Units / K sq. ft. Trips Trips Trips <br />Trips Trips In Trips Trips <br />Out In Out <br />1,500 11,050 210 650 860 660 405 1,065 <br />Residential <br />500 21,350 300 180 480 890 965 1,855 <br />Retail <br />Non-retail <br />1,700 16,480 1,995 280 2,275 370 1,815 2,185 <br />Commercial <br />Total 48,880 2,505 1,110 3,615 1,920 3,185 5,105 <br /> <br />15% Transit and <br />Multi-use Reduction 41,550 2,130 945 3,075 1,630 2,710 4,340 <br /> Factor* <br />TCAAP Traffic Analysis <br />Technical Memorandum 13March 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.