My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-14 Special WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2014
>
09-08-14 Special WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2014 11:09:38 AM
Creation date
8/26/2014 10:40:21 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION—SEPTEMBER 8, 2014 2 <br /> Mayor Grant questioned how the City would go about getting high quality, sustainable jobs on <br /> TCAAP. <br /> Todd Hanson, Cushman & Wakefield, stated this would be driven by the market and economics. <br /> He believed that the TCAAP site is a unique blank slate, and it is like no other site in the metro <br /> area. He hoped that it would appeal to precision manufacturing and medical, along with research <br /> and development firms. <br /> Mr. Carlson encouraged the City to differentiate itself from the competition through setbacks, <br /> berming, landscaping, building design, trails and other amenities to attract high end corporations. <br /> Mr. Hanson recommended that the flex and office space be merged together to offer greater <br /> flexibility to future developers. It was his opinion that long-term health would require flexibility <br /> and innovation, while allowing for growth. <br /> Discussion ensued regarding spec development verses build to suit development, the height of <br /> light industrial buildings, the quality of tip up panels, the size and scale of light industrial <br /> properties, along with loading dock areas and potential screening options. <br /> Community Development Director Hutmacher summarized the comments provided this <br /> evening. <br /> B. Grading and Spine Road Design Review <br /> Public Works Director Maurer stated that the Kimley Horn Infrastructure Team was present to <br /> discuss the grading plan and spine road portions of the TCAAP infrastructure project. He noted <br /> that Jon Horn, Project Manager, and Tom Lincoln, Task Leader for Land Development, were <br /> present to answer questions. <br /> Jon Horn, Kimley-Horn, discussed the proposed design and location for the spine road in detail <br /> with the Council. He described how utilities would be brought along each side of the spine road. <br /> The alignment of the creek and surrounding drainage was also reviewed. <br /> Councilmember Holden questioned why the spine road location was being altered. <br /> City Administrator Klaers stated that the original placement on the land use map was an <br /> educated guess and that the consultants are now reevaluating the best alignment based on <br /> available information on such site elements as the access point at H and the location of wetlands. <br /> Public Works Director Maurer provided comment on how the new alignment would impact the <br /> properties surrounding the spine road. <br /> Councilmember Holden suggested that the spine road be designed for 35 miles per hour traffic. <br /> Public Works Director Mauer stated that the road would be engineered for 40 miles per hour <br /> traffic but the posted speed would be determined by the State after a speed study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.