My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-7-14-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2014
>
05-7-14-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:33:34 PM
Creation date
9/22/2014 3:21:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for May 7, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-015 - Boston Scientific - PUD Amendment - Building Addition\Memos and <br />Reports_14-015 <br />Page 3 of 9 <br /> <br />06-033 Master Plan PUD 8th <br />Amendment <br />2,250 square foot addition <br />to Building N (14) 11/27/06 (Approved) <br />06-024 Master Plan PUD 7th <br />Amendment <br />10,225 square foot addition <br />to Building N (14) <br />08/28/06 (Approved) <br />Expired <br />06-010 Master Plan PUD 6th <br />Amendment Parking Modifications 04/24/06 (Approved) <br />04-018 Master Plan PUD 5th <br />Amendment <br />Installation of nitrogen <br />generator, vaporizers, and <br />50-foot tall storage tank <br />10/25/04 (Approved) <br />04-017 Master Plan PUD 4th <br />Amendment Parking Modifications 07/12/04 (Approved) <br />04-013 Special Use Permit Satellite antennae for <br />Building L 07/12/04 (Approved) <br />04-004 Site Plan Review Temporary Walkway 02/23/04 (Approved) <br />04-001 <br />Master Plan PUD 3rd <br />Amendment and Final <br />PUD <br />Moving Addition J from <br />Phase 2 to Phase 1 and <br />slightly larger Addition J <br />02/23/04 (Approved) <br />03-025 Master Plan PUD 2nd <br />Amendment <br />Site layout change to allow <br />for Building N Addition 09/29/03 (Approved) <br />03-024 Site Plan Review Building N Addition 09/29/03 (Approved) <br />03-023 Site Plan Review Parking Ramp #1 09/29/03 (Approved) <br />03-007 Site Plan Review Building Addition I 03/31/03 (Approved) <br />03-006 Site Plan Review Building L 03/31/03 (Approved) <br />03-005 Master Plan PUD 1st <br />Amendment <br />Site layout changes to <br />Buildings I, K, L, and M 03/31/03 (Approved) <br />03-004 Final Plat Final Plat and Vacation 06/30/03 (Approved) <br />02-025 Master Plan PUD, <br />Preliminary Plat <br />Guidant 3-phase Master <br />Plan and Preliminary Plat 11/12/02 (Approved) <br />01-025 Sign Variances Lexington Avenue and <br />Water Tower Signage 09/24/01 (Approved) <br /> <br /> <br />5. Boston Scientific Master Plan <br /> <br />The campus Master Plan was originally approved in 2002. A total of 419,500 square feet of <br />building space was proposed for Phase 1, which was scheduled to be completed in 2006. Due to <br />the change in ownership from Guidant to Boston Scientific in 2006, as well as other market <br />conditions, portions of Phase 1 have not been constructed. Two new buildings (L and K) and an
The URL can be used to link to this page
Your browser does not support the video tag.