Laserfiche WebLink
Page 2 of 2 <br /> <br /> <br />The quote for the manufacture and placement of the sign is $10,030.00 and is attached. Attached <br />is a graphic prepared by Fourth Dimension showing the proposed sign. Also attached is a photo <br />of the existing City sign for comparison purposes. Other costs for the full installation of the sign <br />would be the curbing around the sign and the Public Works crew’s time for extending electrical <br />service for the LED lighting, preparing the site, and placing landscape rock inside the curbing. <br /> <br />Tim Witz of Fourth Dimension will try to attend the Council meeting should there be any detail <br />questions about the sign or the internal lighting. Staff has discussed with Tim whether or not the <br />sign could be installed in 2014 given a mid-October start date. Of course, the answer is; “It’s <br />weather dependent”. It takes approximately four weeks to manufacture the sign; so if all the <br />preparatory work at the site can be completed by the time the sign is manufactured, it may be <br />possible. If Council gives direction to proceed this evening, staff and Fourth Dimension will <br />make every effort to complete the installation this year. <br /> <br />Attachments <br /> <br />Attachment A: Easement Area <br />Attachment B: Fourth Dimension Quote <br />Attachment C: Graphic of New Sign <br />Attachment D: Photo of Existing CR E-2 Sign <br />