Laserfiche WebLink
DRAFT January 9, 2015January 7, 2015January 5, 2015 <br /> <br /> TCAAP Redevelopment Code <br />Page | 40 <br /> <br />i. Internal building height shall be measured from finished floor to the bottom of the <br />structural members of the ceiling.Elevator and stair enclosures; public flagpoles and <br />monuments; and chimneys are exempt from the height limit. <br />ii. Church Spires, belfries, cupolas, and domes shall be exempted from the height limits so <br />long as they do not exceed a height of 65 feet as measured from the ground level. <br />iii. Vents, tanks, solar energy systems, HVAC equipment, and other mechanical enclosures <br />shall be exempted from the height limits so long as they do not extend more than 12’ <br />above the roof upon which they are located. <br />ii.iv. Internal building height shall be measured from finished floor to bottom of the structural <br />members of the ceiling. <br />v. Floor to ceiling heights shall not apply to parking structures or civic buildings. <br />ii. AHC Section 1325.03 – Subsection 3 on heights shall not apply. <br />(j)(i) Encroachments: <br />i. Encroachments into right of way shall not be permitted <br />ii. Encroachments over Required Setbacks: Canopies, awnings, galleries, and balconies <br />may encroach over any required setback areas per standards established in each <br />zoning district as long as the vertical clearance is a minimum of 10’ from the finished <br />sidewalk elevation. <br />1. Maximum of 50% of the depth of the sidewalk or 10’ (whichever is less) (except <br />blade signs which shall encroach no more than 6’ from the building façade line). <br />2. Minimum vertical clearance from the finished sidewalk shall be 10’ <br />3. In no case shall an encroachment be located over an on-street parking or travel <br />lane. <br />4. Additional license agreements are required for all encroachments over public R-O- <br />W. <br /> <br />(l)(j) Phased Developments: Due to the long-term development vision within the TRC, certain <br />building form and site development standards may be deferred for phased development <br />projects meeting the following criteria: <br />i. Submission of a site plan that illustrates how development and any related private <br />improvements will be phased over time. Each phase of the site plan shall independently <br />comply with all applicable standards of the TRC unless an Administrative Modificationa <br />Permitted Adjustment is granted. <br />ii. Required private landscaping and open space amenities may also be phased with the <br />building. <br />iii. If a full block is being phased in development, Ddesign/ and development standards <br />may be measured established at the full block level in order to accommodate the <br />various phases of the development, in order to work within a phased development <br />plan. <br />(m)(k) Required Public Improvements: All site plans that require public improvements such <br />as sidewalk and streetscape improvements may be deferred through the payment of a <br />proportional fee-in-lieu when the entire length of that block is not within the site plan.