Laserfiche WebLink
address modifications to the building footprints, parking areas, and other elements on the site. <br />The Campus Master Plan was last revised in the PUD Amendment request in Planning Case 14- <br />015 (Attachment D). <br /> <br /> <br />Overview of Request <br /> <br />The Boston Scientific Campus in Arden Hills has transitioned over the last few years into a more <br />integrated component of the company’s global operations. As a result, the need for the existing <br />approximately 1.2 million square feet of building space available on the campus has diminished. <br />Boston Scientific has decided to reduce the overall amount of building area on its campus <br />through the sale of Buildings A, B, and C, which are located in the southwest quadrant of the <br />property. The facilities currently located in these three buildings would be consolidated within <br />other buildings on the campus to improve operational efficiencies. <br /> <br />The proposed subdivision would create a 15.6 acre parcel (Lot 1) situated at the corner of <br />Hamline Avenue North and County Road F that would include Buildings A, B, and C and <br />Parking Ramp One, as identified on the Campus Master Plan. The second parcel (Lot 2) would <br />be approximately 78 acres in size and would continue to function as the Boston Scientific <br />Campus. In order to accommodate the subdivision, Boston Scientific is requesting an amendment <br />to the PUD. This amendment would accomplish two things: first, the existing PUD would be <br />revised to reflect the change in property boundaries and the proposed updates to the Campus <br />Master Plan; and second, a separate PUD for the Lot 1 would be created allowing the two sites to <br />function independently. <br /> <br />The revision to the Campus Master Plan includes the removal of proposed Buildings H and G, <br />which are currently shown being constructed where the lot division line has been proposed, and <br />minor adjustments from the current campus plan to the location of future buildings and parking <br />ramps on Lot 2. The overall density of building area would be reduced as a result of the <br />elimination of Buildings H and G. No additional buildings are proposed at this time on Lot 1. <br />The proposed Campus Master Plan is included in Attachment C. <br /> <br />The Campus Master Plan also shows modifications to the existing surface parking lot located <br />between Buildings A, B, and C and Buildings E and D to create a defined border along the Lot 1 <br />and Lot 2 property line. This would be accomplished by removing existing bituminous surfaces <br />and installing landscaping. A Site Plan Review would be required to be approved by the City <br />Council before this work is undertaken. At that time, the City would evaluate items such as <br />grading, landscaping requirements, and parking lot setbacks in detail. Boston Scientific expects <br />to apply for a Site Plan Review in Fall 2015 or Spring 2016 to complete the necessary site <br />modifications to demarcate the properties. <br /> <br />The Campus Master Plan also indicates a future second access drive for Lot 1 on Hamline <br />Avenue, just north of the existing entrance to this site. The new access is not being evaluated as <br /> <br />City of Arden Hills <br />City Council Meeting for February 23, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-001 - Boston Scientific - Master PUD Amendment and <br />Subdivision\Memos_15-001 <br />Page 2 of 9 <br />