Laserfiche WebLink
part of this proposal. Boston Scientific has included this access drive as a possible option for a <br />future property owner or tenant on the site depending on their needs. Construction of this access <br />would require a Site Plan Review as well as approval through the Ramsey County Public Works <br />Department. Ramsey County has reviewed the Campus Master Plan and their comments are <br />included in Attachment E. <br /> <br />The development plans for the Boston Scientific Campus would be phased over the next 20 <br />years. The construction of new buildings and parking ramps will be coordinated with the future <br />growth of Boston Scientific Corporation. An estimated construction schedule is included in <br />Attachment A. As is the case with the existing PUD, new building construction or site <br />modifications identified on the approved Campus Master Plan will require the submittal of a Site <br />Plan Review for City Council approval prior to construction. Proposed construction or site <br />modifications not conforming to the approved Campus Master Plan would require an amendment <br />to the PUD. This requirement would apply to both Lot 1 and Lot 2. <br /> <br /> <br />Plan Review <br /> <br />A full evaluation of the proposal was presented to the Planning Commission at their February 4 <br />2015, Regular Meeting. The staff report to the Planning Commission on this case is included in <br />Attachment F. The following section provides a summary of the main topics discussed by the <br />Planning Commission and areas where flexibility from the Zoning Code is needed through the <br />PUD process. <br /> <br />Subdivision Code Review <br /> <br />The proposed plat would subdivide the Boston Scientific property into two lots. Both Lot 1 and <br />Lot 2 abut their full right-of-way frontage on a public street and exceed the Zoning Code <br />requirements in terms of lot width, depth, and area. Drainage and utility easements have been <br />provided on each lot and over delineated wetland areas in accordance with the Subdivision Code <br />requirements. <br /> <br />The park dedication requirements included in the Subdivision Code were satisfied by the <br />Guidant Corporation in conjunction with the original Master PUD and Final Plat approval for the <br />site in 2002. Guidant was required to provide the City with a public trailway easement and a <br />private trailway license, and to construct and convey a picnic shelter for Cummings Park in order <br />to satisfy this requirement. No additional park dedication is required. <br /> <br /> <br />Zoning Code Review <br /> <br />A. Lot Size, Structure Coverage, and Landscaping <br /> <br /> <br />City of Arden Hills <br />City Council Meeting for February 23, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-001 - Boston Scientific - Master PUD Amendment and <br />Subdivision\Memos_15-001 <br />Page 3 of 9 <br />