My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-04-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
05-04-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 8:27:27 AM
Creation date
4/30/2015 8:26:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />DATE: May 4, 2015 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br />John Anderson, Assistant City Engineer <br /> <br />SUBJECT: 2015 PMP’s (Venus/Crystal Neighborhood and Grant/Noble/Lake Ln <br />Neighborhood) Contract Award and Construction Services Proposal <br /> <br /> <br /> <br />Requested Action <br /> <br />The City Council is requested to approve the following: <br /> <br />1. Adopt Resolution 2015-030 Awarding the 2015 PMP Contract to Valley Paving, Inc. <br />2. Accept the proposal from Elfering and Associates for construction services <br /> <br />Discussion <br /> <br />On February 23, 2015, the City Council adopted Resolution 2015-013 (Venus/Crystal) and <br />Resolution 2015-014 (Grant/Noble/Lake Lane) approving the Plans and Specifications and <br />Ordering the Advertisement for Bids. Bids were opened on Thursday, March 19, 2015. <br /> <br />One bid was solicited for both 2015 PMP neighborhoods. The bid contained two alternates. The <br />first alternate bid was for the use of HDPE (plastic) pipe for the storm sewer. This alternate <br />turned out to actually be more expensive and therefore staff is not recommending it be awarded. <br />The second alternate was for water replacement in the Venus/Crystal neighborhood. To give the <br />Council some options, the worst water main (highest break history) replacement was put into the <br />base bid with the areas with a lesser break history placed in an alternate bid. Based on the bids <br />received (these were the costs presented at the assessment hearing) staff is recommending award <br />of alternate number 2 replacing more water main in the Venus/Crystal neighborhood. <br /> <br />There were a total of eight bids received. The following table lists the bidders name and their <br />total bid including Alternate No. 2 (but not Alternate No.1): <br /> <br /> <br />PUBLIC HEARING – 2B <br /> <br /> <br />MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.