My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-04-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
05-04-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 8:27:27 AM
Creation date
4/30/2015 8:26:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMIK k ASSOCIATIS <br />TAUT BATA <br />April 28, 2015 <br />File: 170025E - 0060 <br />Mr. John Anderson, Assistant City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />RE: 2015 PMP Improvements Project <br />Recommendation of Award <br />Dear Mr. Anderson: <br />Bids were opened for the above referenced project at 10:00 a.m. on Thursday, March <br />19, 2015 in accordance with the Advertisement for Bids. The project consists of <br />improvements in the Venus/Crystal neighborhood and the Noble/Grant neighborhood. <br />The improvements include street reconstruction, watermain installation and storm sewer <br />improvements. <br />Eight (8) bids were received from the following companies listed below from lowest to <br />highest total bid: <br />Corporation Total Base Bid with Alternate 2.0 <br />Valley Paving, Inc.3,896,796.88 <br />Astech Corporation 4,233,026.72 <br />Palda& Sons, Inc.4,294,821.86 <br />Park Construction, Co. 4,351,515.05 <br />Northwest Asphalt 4,530,919.36 <br />T. A. Schifsky& Sons, Inc. 4,759,464.55 <br />Redstone Construction 4,966,656.59 <br />Meyer Contracting, Inc. 5,406,576.06 <br />Alternates were bid with the project to provide the City flexibility depending on the pricing <br />received. Alternate 1.0 provided the option for Contractor's to utilize HDPE (high density <br />polyethylene pipe) storm sewer material in lieu of concrete. It was anticipated that this <br />might result in a cost savings, however in Valley Paving, Inc.'s bid there is an increase to <br />the base bid of $15,045.57. Based on this increase, we are not recommending including <br />Alternate 1.0 in the award. <br />10062 Flanders Court NE, Blaine, MN 55449—Ph: (763)780-0450—Fax:(763)780-0452
The URL can be used to link to this page
Your browser does not support the video tag.