Laserfiche WebLink
circulation within the retail center area, and the construction of stormwater bio-filtration basins <br />required for the proposed build-out of the site. <br /> <br />Prior to the City’s approval of the Master PUD for the retail center, a Conditional Use Permit <br />(CUP) request from Frattallone’s Hardware was approved in Planning Case 97-009 for fencing a <br />part of the parking lot on the property to allow for an seasonal garden sales area. A CUP was <br />required because the Zoning Code does not specifically allow or prohibit outdoor garden sales <br />area as a use. The seasonal outdoor sales area continues to operate on the property, although the <br />area was never fenced off as proposed and its footprint has expanded beyond what was originally <br />approved by the City in the CUP. <br /> <br />The Master PUD and subsequent amendment, along with the associated plans and the conditions <br />of approval, remain valid. The Master Site Plan approved in Planning Case 09-011 and the <br />revised Preliminary Plat from Planning Case 11-016 are both included in Attachment D for <br />reference. Neither Phase II nor Phase III of the approved Master PUD is being reviewed as part <br />of this amendment request. The buildings included in these future phases would return to the <br />Planning Commission and City Council for review and approval prior to development. <br /> <br /> <br />1. Overview of Request <br /> <br />The first component of the application is the Preliminary and Final Plat to subdivide Lot 3 within <br />the existing Arden Plaza plat into three separate parcels. Frattallone’s Hardware, which is a <br />current tenant in the retail center, has approached Wellington Management regarding the <br />purchase of its store and the existing outdoor garden center. To accommodate this, a new Lot 4 <br />would be created comprised of the Frattallone’s portion of the building, the area occupied by the <br />outdoor seasonal sales area, and related parking and service areas. <br /> <br />The new Lot 3 would be comprised of the remaining retail center, the primary parking area, <br />access drives on County Road E and Lexington Avenue, and the stormwater pond at the <br />southeast corner of the site. The common lot line between the remaining portion of the retail <br />building on Lot 3 and the Frattallone’s Hardware store on Lot 4 would be defined by a demising <br />wall. The definition of a demising wall is a wall used jointly by two parties erected upon a line <br />dividing two parcels of land, each of which is a separate real estate entity. The City Building <br />Official and the Lake Johanna Fire Department have been working with the property owner on <br />the specifications of the demising wall and final building permits will be required prior to <br />construction. Approval of the Final Plat will be conditioned on the issuance of a Certificate of <br />Occupancy for the proposed remodeling work. <br /> <br />The new Lot 5 would include the future Building #4, which is proposed to be constructed in <br />Phase III of the approved Master PUD, along with a small parking area. Lot 5 is located along <br />Lexington Avenue. The proposed footprint of Building #4 has increased from the Master PUD <br />approved in 2009. The submitted master site plan indicates that this building would be 20,136 <br />square feet in size, an increase of 2,136 square feet from the 2009 PUD approval. <br /> <br />City of Arden Hills <br />Planning Commission Meeting for February 4, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-002 - Arden Plaza - Master PUD Amendment and Subdivision\Memos_15-002 <br />Page 2 of 16