My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-04-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
02-04-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 3:48:40 PM
Creation date
5/1/2015 3:39:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Since 2002, the City has also approved eleven separate amendments to the original PUD to <br />address modifications to the building footprints, parking areas, and other elements on the site. <br />Included in Attachment E is the most current Campus Master Plan based on the original PUD <br />approval and subsequent amendments. The campus plan was last revised in the PUD <br />Amendment request in Planning Case 14-015. <br /> <br /> <br />1. Overview of Request <br /> <br />The Boston Scientific Campus in Arden Hills has transitioned over the last few years into a more <br />integrated component of the company’s global operations. As a result, the need for the existing <br />approximately 1.2 million square feet of building space available on the campus has diminished. <br />Boston Scientific has decided to reduce the overall amount of building area on its campus <br />through the sale of Buildings A, B, and C, which are located in the southwest quadrant of the <br />property. The facilities currently located in these three buildings would be consolidated within <br />other buildings on the campus to improve operational efficiencies. <br /> <br />The proposed subdivision would create a 15.6 acre parcel (Lot 1) situated at the corner of <br />Hamline Avenue North and County Road F that would include Buildings A, B, and C and <br />Parking Ramp One, as identified on the Campus Master Plan. The second parcel (Lot 2) would <br />be approximately 78 acres in size and would continue to function as the Boston Scientific <br />campus. The proposed Preliminary and Final Plat of the site are included in Attachment C. In <br />order to accommodate the subdivision, Boston Scientific is requesting an amendment to the <br />PUD. This amendment would accomplish two things: first, the existing PUD would be revised to <br />reflect the change in property boundaries and the proposed updates to the Campus Master Plan; <br />and second, a separate PUD for the Lot 1 would be created allowing the two sites to function <br />independently. <br /> <br />The revision to the Campus Master Plan includes the removal of proposed Buildings H and G, <br />which are currently shown being constructed where the lot division line has been proposed, and <br />minor adjustments from the current campus plan to the location of future buildings and parking <br />ramps on Lot 2. The overall density of building area would be reduced as a result of the <br />elimination of Buildings H and G. No additional buildings are proposed at this time on Lot 1. <br />The proposed Campus Master Plan is included in Attachment D. <br /> <br />The Campus Master Plan also shows modifications to the existing surface parking lot located <br />between Buildings A, B, and C and Buildings E and D to create a clearly defined border along <br />the property line between Lot 1 and Lot 2. This would be accomplished by removing existing <br />bituminous surfaces and installing landscaping. A Site Plan Review would be required to be <br />reviewed and approved by the Planning Commission and City Council before this work is <br />undertaken. At that time, the City would evaluate items such as grading, landscaping <br />requirements, and parking lot setbacks in detail. Boston Scientific expects to apply for a Site <br /> <br />City of Arden Hills <br />Planning Commission Meeting for February 4, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-001 - Boston Scientific - Master PUD Amendment and <br />Subdivision\Memos_15-001 <br />Page 2 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.