Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – February 4, 2015 9 <br /> <br />lot. Under the PUD, Guidant was permitted to develop multiple principal buildings on a single <br />parcel. <br /> <br />Land Use Plan: <br />Site Data <br />Light Industrial and Office <br />Existing Land Use: Light Industrial and Office <br />Zoning: I-1: Limited Industrial / PUD Overlay <br />Current Lot Sizes: 93.3 acres (Lot 1: 15.6 acres; Lot 2: 77.7 acres) <br />Topography: Level <br /> <br />Associate Planner Bachler reviewed the surrounding area, the Plan Evaluation, Zoning Code <br />Review and Sign Code requirements. <br /> <br />Associate Planner Bachler provided the Findings of Fact for review: <br /> <br />1. The applicant has requested approval of a Preliminary and Final Plat and an amendment <br />to the PUD for the property at 4100 Hamline Avenue North. <br />2. The subdivision would create two new parcels (Lot 1 and Lot 2) within the existing <br />Boston Scientific Campus plat. <br />3. The proposed subdivision is in conformance with the Subdivision Ordinance in Chapter <br />11 of the Arden Hills City Code. <br />4. A Master PUD was approved for 4100 Hamline Avenue North in Planning Case #02-025. <br />5. The applicant has requested an amendment to the PUD to reflect the change in the <br />property boundaries, to update the Campus Master Plan, and to create a separate PUD for <br />the proposed Lot 1. <br />6. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a property owner. <br />7. Lot 1 and Lot 2 are located in the I-1 Limited Industrial Zoning District. <br />8. The proposed uses on Lot 1 and Lot 2 are permitted uses in the I-1 District. <br />9. The revisions to the Campus Master Plan are in substantial conformance with the original <br />PUD approval granted by the City in Planning Case #02-025. <br />10. The PUD amendment is in substantial conformance with the requirements of the City’s <br />Zoning Code. <br />11. Where the plan is not in conformance with the City’s Zoning Code, flexibility has been <br />requested by the applicant and/or conditions have been placed on the approval that would <br />mitigate the nonconformity. <br />12. The PUD amendment would grant flexibility for Lot 1 in terms of building height, front <br />yard setback, and the number of principal buildings allowed on a lot. <br />13. The PUD amendment would grant flexibility for Lot 2 in terms of building height, front <br />yard setback, structure coverage, and the number of principal buildings allowed on a lot. <br />14. The applicant has provided a Parking Calculation Plan that shows adequate “proof-of- <br />parking” spaces on Lot 2 in the event that additional parking is needed. <br />15. The proposal will not adversely impact the surrounding neighborhood or the City as a <br />whole. <br /> <br />Associate Planner Bachler stated that staff is supportive of the request from Boston Scientific <br />for a subdivision and amendment to the existing PUD for the campus. The subdivision will allow <br />the company to consolidate their operations on their campus and improve overall efficiencies.