My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
06-15-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:21:50 PM
Creation date
6/12/2015 11:39:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Added the replacement of existing water main along County Road E2 <br />where the repair of three water main breaks in 2015 revealed deteriorated <br />pipe material. Also included the addition of a water main loop along Old <br />Hwy 10 from County Road E to County Road E2 to provide redundancy <br />to the system. These improvements are estimated to cost $400,000 and <br />were placed in 2017. <br /> The North Water Tower Repainting is planned for 2016. It had been <br />budgeted at $750,000. The estimated cost has been raised to $900,000 <br />based on a current analysis of the market for this type of work. Note: <br />depending on the timing for the construction of a new water tower in <br />TCAAP, it may be advisable to wait until that new tower is operational to <br />repaint the existing tower as the new tower will provide better back-up <br />while the existing tower is out-of-service for repainting. <br /> <br />D. Street Department <br /> Lexington Avenue Improvement (I-694 to CR F) raised the City <br />contribution from $100,000 to $300,000 to reflect the costs the City has <br />agreed to with approval of the Cooperative Agreement. <br /> Added the Hwy 96 Landscaping in 2017 at an estimated cost of $600,000 <br />in 2017. This item reflects that medians and boulevard areas have been <br />created with the recently completed U.S. 10/Hwy 96 Grade Separation <br />project and more will be created with the 35W/Hwy 96 Interchange project <br />that will need to be landscaped. The cost is truly just a place saver with no <br />preliminary design estimates preformed at this time. <br /> Old Snelling Avenue, including the bridge replacement, has been moved <br />from 2025 to 2017 for two purposes. First, it is anticipated that in mid- <br />2016 the City should be granted State bridge bonding monies for half of <br />the bridge construction cost. Second, there was much discussion about this <br />project and its timing at the franchise fees public hearing. So the project <br />has been moved to 2017 for Council discussion regarding when it should <br />be considered. <br /> <br /> <br />E. Equipment <br /> Removed “Replace 2005 4-Door Diesel Pickup” at $44,000 from 2016. <br /> Increased the cost of the “Replace 1997 Street Sweeper” anticipating that <br />TCAAP could have some public permeable pavers that would require a <br />Vacuum Sweeper (which is slightly more expensive) to maintain. <br /> At this time, 2019 only has some anticipated equipment needed for the <br />development of TCAAP and 2020 has nothing. As the timeframe and <br />maintenance responsibilities for TCAAP infrastructure become clearer in <br />the next few months, a much better estimate of future equipment needs for <br />the out years of the CIP can and will be provided. <br /> <br />If you have any questions about any of these items, please let me know. <br />
The URL can be used to link to this page
Your browser does not support the video tag.