Laserfiche WebLink
3' <br /> iCITY OF ARDEN HILLS <br /> MEMORANDUM <br /> DATE: March 13, 2001 <br /> TO: Joe Lynch; City Administrator <br /> FROM: Thomas J. Moore; Parks & Recreation Director <br /> SUBJECT: Replacement of the Floral Park Playstructure <br /> Background <br /> The existing playstructure at Floral Park was installed in the summer of 1987. It is a <br /> wooden and steel structure that is showing its age. The wood is in poor condition and the <br /> steel is rusting. In addition the safety box area is filled with pea gravel,which does not <br /> meet the safety codes. <br /> Budget <br /> The 2001 Capital Improvement Plan Budget for the replacement of the Floral Park <br /> playstructure is $25,000.00. The proposed replacement playstructure is a Kid's Choice <br /> play system from Miracle Recreation. The cost of the new playstructure is $ 13,791.00. <br /> Excavation and Installation will cost$ 5,000.00. The construction of a new safety box, <br /> filled with Gerrick Wood fiber will cost$ 5,575.00. The final total cost, including Sales <br /> tax is; $ 25,262.42. This leaves a deficit of$ 262.42. Staff anticipated this deficit and <br /> planned accordingly so that the replacement playstructure can be purchased and all <br /> budgetary obligations are met. <br /> The budget deficit of$ 262.42 will be made up through savings realized in the <br /> replacement of the playstructure at Sampson Park, CIP # 509-01. The budget for CIP # <br /> 509-01 is $ 15,000.00. The actual cost of the replacement of the playstructure at <br /> Sampson Park is $ 11,930.00. This produced savings of$ 3,070.00. <br /> Notification Process <br /> On February 26, 2001, Staff mailed out 300 letters to the residents of the Floral Park <br /> neighborhood. A sample letter is attached. Staff received a total of five phone calls, all <br /> of which were in support of the project. <br /> Parks,Trails and Recreation Committee (PTRC)Recommendation <br /> At the March 27, 2001 PTRC meeting the Committee recommended presenting the bid <br /> from Miracle Recreation to Council for approval. <br /> Staff Recommendation <br /> Staff recommends that the City Council authorize the replacement of the Floral Park <br /> playstructure at a cost not to exceed $ 25,262.42. <br />