My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-14-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 05-14-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2015 4:27:15 PM
Creation date
6/29/2015 4:26:32 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum, 2001 Water Tower Maintenance <br /> Page Two <br /> May 6, 2001 <br /> The Engineer's Cost Estimate was $24, 200 for the base bid, $21,000 for Option A and <br /> $10, 000 for Option B. <br /> Recommendation <br /> AEC Engineering has reviewed the qualifications of the lowest bidder, and finds that <br /> Champion Coatings, Inc. meets the requirements of the Project Specifications. Based <br /> upon the above bids, AEC Engineering along with staff, recommends Champion <br /> Coatings, Inc. be awarded the contract for the cleaning,repairing and painting of the <br /> 500,000 gallon Hydropillar(North Tower) and ladder modifications on the 1.0 MMG <br /> Hydropillar(South Tower) at a cost not to exceed$24,800. Furthermore staff <br /> recommends that the City Council authorize Option A, the placing of the new City Logo <br /> on the North Tower at a cost not to exceed $13,675. The total overall cost of the 2001 <br /> water tower Maintenance project is $38,475. <br />
The URL can be used to link to this page
Your browser does not support the video tag.