My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-15-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
07-08-15-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 1:06:58 PM
Creation date
8/13/2015 12:32:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for July 8, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-014 - Verizon Wireless CUP - 2 Pine Tree Drive\Memos_Reports_15-014 <br />Page 1 of 6 <br /> MEMORANDUM <br /> <br />DATE: July 8, 2015 PC Agenda Item 3.A <br /> <br />TO: Planning Commission <br /> <br />FROM: Matthew Bachler, Associate Planner <br /> <br />SUBJECT: Planning Case #15-014 – Public Hearing Required <br /> Applicant: Verizon Wireless (Rob Viera) <br /> Property Address: 2 Pine Tree Drive <br /> Request: Conditional Use Permit <br /> <br /> <br />Requested Action <br /> <br />The applicant has requested a Conditional Use Permit (CUP) to install twelve wireless panel <br />antennas and related equipment on the existing building located at 2 Pine Tree Drive. <br /> <br /> <br />Background <br /> <br />1. Overview of Request: <br /> <br />Verizon has requested a CUP to install twelve wireless panel antennas and related equipment on <br />the existing Bethel University building at 2 Pine Tree Drive. Verizon currently has antennas <br />installed on the tower located at 1296 County Road F, near the intersection of Hamline Avenue <br />and Interstate 694. The purpose of the additional antennas at 2 Pine Tree Drive is to improve the <br />provider’s wireless service in the southeast quadrant of the City along County Road E between <br />Lexington Avenue and Highway 51. <br /> <br />The proposed antennas would be attached to the existing penthouse structure located on the roof <br />of the principal building on the property. All antenna equipment would be painted with a solid <br />color to match the color of the existing penthouse structure. The overall height of the existing <br />building measured to the penthouse roof is 62.7 feet. The antennas would each measure eight <br />feet in length and would not extend beyond the penthouse roofline. Verizon would lease the <br />required roof and utilities right-of-way space from Bethel University. The applicant has <br />submitted a letter from the Verizon engineer working on the project, wireless coverage maps, <br />and a complete plan set (Attachments D and E). <br />
The URL can be used to link to this page
Your browser does not support the video tag.