Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for July 8, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-014 - Verizon Wireless CUP - 2 Pine Tree Drive\Memos_Reports_15-014 <br />Page 1 of 6 <br /> MEMORANDUM <br /> <br />DATE: July 8, 2015 PC Agenda Item 3.A <br /> <br />TO: Planning Commission <br /> <br />FROM: Matthew Bachler, Associate Planner <br /> <br />SUBJECT: Planning Case #15-014 – Public Hearing Required <br /> Applicant: Verizon Wireless (Rob Viera) <br /> Property Address: 2 Pine Tree Drive <br /> Request: Conditional Use Permit <br /> <br /> <br />Requested Action <br /> <br />The applicant has requested a Conditional Use Permit (CUP) to install twelve wireless panel <br />antennas and related equipment on the existing building located at 2 Pine Tree Drive. <br /> <br /> <br />Background <br /> <br />1. Overview of Request: <br /> <br />Verizon has requested a CUP to install twelve wireless panel antennas and related equipment on <br />the existing Bethel University building at 2 Pine Tree Drive. Verizon currently has antennas <br />installed on the tower located at 1296 County Road F, near the intersection of Hamline Avenue <br />and Interstate 694. The purpose of the additional antennas at 2 Pine Tree Drive is to improve the <br />provider’s wireless service in the southeast quadrant of the City along County Road E between <br />Lexington Avenue and Highway 51. <br /> <br />The proposed antennas would be attached to the existing penthouse structure located on the roof <br />of the principal building on the property. All antenna equipment would be painted with a solid <br />color to match the color of the existing penthouse structure. The overall height of the existing <br />building measured to the penthouse roof is 62.7 feet. The antennas would each measure eight <br />feet in length and would not extend beyond the penthouse roofline. Verizon would lease the <br />required roof and utilities right-of-way space from Bethel University. The applicant has <br />submitted a letter from the Verizon engineer working on the project, wireless coverage maps, <br />and a complete plan set (Attachments D and E). <br />