My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-31-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
08-31-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:28:41 PM
Creation date
8/31/2015 11:13:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT ITEM – 5C <br /> <br />City of Arden Hills <br />City Council Meeting for August 31, 2015 <br /> <br />P:\Planning\Planning Cases\2015\PC 15-017 - Boston Scientific - Site Plan Review\Memos_Reports_15-017 <br /> <br />Page 1 of 6 <br /> <br /> MEMORANDUM <br /> <br />DATE: August 31, 2015 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> Patrick Klaers, City Administrator <br /> <br />FROM: Ryan Streff, City Planner <br /> <br />SUBJECT: Planning Case #15-017 <br /> Applicant: Boston Scientific Corporation <br /> Property Location: 4100 Hamline Avenue North <br /> Request: Site Plan Review – Day Care Relocation <br /> <br /> <br /> <br />Requested Action <br /> <br />Motion to approve Planning Case 15-017 for a Site Plan Review in order to relocate the day care <br />facility and outdoor play area from Building 9 to Building 10 within the Boston Scientific <br />Campus at 4100 Hamline Avenue North, based on the findings of fact, submitted plans, and the <br />six (6) conditions in the August 31, 2015, report to the City Council. <br /> <br /> <br />Background/Overview of Request <br /> <br />Boston Scientific is requesting a Site Plan Review to relocate the existing day care facility <br />managed by New Horizon from the north side of Building 9 to the east side of Building 10. The <br />relocation of the facility is needed in order to facilitate the planned interior remodel of the space <br />within Building 9 to accommodate an expanded area for distribution and final packaging. <br /> <br />The new facility proposed in Building 10 includes 8,500 square feet of interior space and a 3,150 <br />square foot fenced outdoor play area. Three (3) infant rooms, two (2) toddler rooms, three (3) <br />pre-school rooms, and an indoor play area now required for muscle development will be <br />constructed inside the new day care facility. A new building entrance, sidewalk, stoop, and <br />ramp will also be constructed to provide direct access to the proposed day care facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.