Laserfiche WebLink
City of Arden Hills- Comprehensive Plan- DRAFT <br /> Compatible uses such as office buildings are also intended for this <br /> area. <br /> 7. Office (0)—Predominantly administrative, professional, or clerical <br /> services; includes medical clinics <br /> 8. Mixed use industrial — includes light manufacturing and/or processing, <br /> warehousing, distribution, and offices. <br /> 9. Light industrial— primarily light manufacturing and/or processing of <br /> products; could include light industrial land use, distribution, <br /> warehouse facilities, and offices as a secondary use. <br /> 10.Park and Open Space (P/OS)—areas designated as public parks. <br /> 11.Public & institutional (P/t)—areas designated for uses such as <br /> government buildings, colleges, schools, and religious uses but not <br /> medical uses. <br /> 12.Utility(1)— Public or private land occupied by a power substation, water <br /> tower, municipal well, pumping station, or similar use. <br /> 13.Vacant (VAC) — Private land not occupied with a building or use. <br /> 14.Right-of-way (ROW)— public vehicular, transit and/or pedestrian rights- <br /> of-way. <br /> 15.Water— includes permanently flooded open water, rivers and streams, <br /> and wetlands (may not show all national wetland inventory wetlands on <br /> the map). <br /> 6.4 Future Land Use <br /> The 2008 future land use data does not assume significant changes to the <br /> developed residential areas of Arden Hills (map). While the vacant land south of <br /> Highways 96 and 10 may be developed, almost all population, household, and <br /> employment growth anticipated in Arden Hills will be accommodated by the <br /> proposed TCAAP redevelopment. Nevertheless, there are a few potential land <br /> use changes in the developed part of Arden Hills south of Highway 96 and 10. <br /> DRAFT 26 <br /> 3/14/2008 <br />