Laserfiche WebLink
weather-proof cabinet-like structure in lieu of a building, it shall be mounted upon a suitable <br />concrete pad. <br /> 2. If there is an equipment building constructed on site, it shall be subject to City <br />approval. <br /> 3. To the extent possible, the equipment building or cabinet shall be located adjacent to or <br />near existing on-site buildings. <br /> 4. The equipment building or cabinet shall be screened from view of adjacent properties <br />by suitable vegetation, except where non-vegetative screening (e.g., a decorative wall or fencing) <br />better reflects and complements the character of the neighborhood. <br /> 5. The City shall require a suitable financial surety to ensure future removal of the <br />equipment building or cabinet upon termination of the lease. <br /> 6. All applicants must include a signed report from a State registered engineer showing <br />compliance with all applicable codes, standards and structural requirements of how the <br />additional antennas will affect the water tower structure. A final inspection report from a State <br />registered engineer showing the work completed is in compliance with previously approved <br />plans shall also be required. <br /> Subd. 9 Requirements. <br /> A. A building permit shall be required for all applications except those as stated in Section <br />1325.09 Subd 1.A. <br /> B. The City shall require the applicant to complete a radio frequency interference study that <br />is carried out by an independent and qualified professional reasonably selected by the City that is <br />able to demonstrate that the applicant's use will not interfere with any existing communications <br />facilities. <br /> <br /> <br /> <br /> <br />