Laserfiche WebLink
<br /> Mr. John Anderson, P.E. <br /> December 11, 2015 <br /> Page 2 of 2 <br /> <br />N:\Proposals\Arden Hills\Lift Station 11\lift station 11 proposal ltr.doc <br />• Assist with State and local agency reviews and permitting (We do not anticipate any permits are <br />required from the MPCA or the MCES since this is an existing lift station) <br />• Bidding services <br /> <br />Task 3 – Construction Phase <br />• Construction administration <br />• Construction observation <br />• Construction staking <br />• Start-up services <br />• Record drawings <br /> <br />We propose to complete the above tasks for a total fee of $44,500. I recommend that we work on an <br />hourly basis with a not-to-exceed this amount. The following is a summary of our fees: <br /> <br />Item Fee <br />Task 1 - Preliminary Design Phase $8,800 <br />Task 2 – Final Design/Biddi ng Phase $16,500 <br />Task 3 – Construction Phase $19 ,200 <br />Total $4 4,500 <br /> <br />If any permits are required, the permit application fees shall be the responsibility of the City. However, <br />as noted above, we do not anticipate any permits are required from the MPCA or MCES. <br /> <br />We would be able to begin work on this project immediately upon approval from the City. <br /> <br />Thank you for the opportunity to present this proposal. We look forward to working with you and your <br />staff. If you need any additional information or have any questions on the above, please do not hesitate <br />to give me a call at 612-803-5223. <br /> <br />Respectfully submitted, <br /> <br />BOLTON & MENK, INC. <br /> <br /> <br /> <br />Seth A. Peterson, P.E. <br />Principal Engineer <br /> <br />Cc: Mark D. Kasma, P.E., Senior Principal Engineer <br />