My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-008
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2010-2019
>
2015
>
2015-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 4:14:45 PM
Creation date
12/17/2015 12:10:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utility lines are placed underground. Amplifier boxes and pedestal mounted terminal <br /> boxes may be placed above ground if existing technology reasonably requires,but shall <br /> be of such size and design and shall be so located as not to be unsightly or unsafe, all <br /> pursuant to plans submitted with Grantee's permit application(s) and approved by City. <br /> 5. Installation of Facilities. No poles, conduits, amplifier boxes, pedestal mounted terminal <br /> boxes, similar structures, or other wire-holding structures shall be erected or installed by <br /> the Grantee without required permit of City. <br /> 6. Safety Requirements. <br /> a. The Grantee shall at all times employ ordinary and reasonable care and shall <br /> install and maintain in use nothing less than commonly accepted methods and <br /> devices for preventing failures and accidents which are likely to cause damage or <br /> injuries. <br /> b. The Grantee shall install and maintain its System and other equipment in <br /> accordance with City's codes and the requirements of the National Electric Safety <br /> Code and all other applicable FCC, state and local regulations, and in such <br /> manner that they will not interfere with City communications technology related <br /> to health, safety and welfare of the residents. <br /> c. All System structures, and lines, equipment and connections in, over, under and <br /> upon the Rights-of-Way of City, wherever situated or located, shall at all times be <br /> kept and maintained in good condition, order, and repair so that the same shall not <br /> menace or endanger the life or property of City or any Person. <br /> SECTION 4. DESIGN PROVISIONS <br /> 1. System Design. <br /> a. Grantee shall develop, construct and operate a state-of-the-art cable <br /> communications system, constructed in accordance with Section 2, Paragraph <br /> (7)(a). <br /> b. All final programming decisions remain the discretion of Grantee, provided that <br /> Grantee notifies City and Subscribers in writing thirty(30) days prior to any <br /> channel additions, deletions, or realignments, and further subject to Grantee's <br /> signal carriage obligations hereunder and pursuant to 47 U.S.C. §§ 531-536, and <br /> further subject to City's rights pursuant to 47 U.S.C. § 545. Location and <br /> relocation of the PEG Channels shall be governed by Section 6, Paragraph 1(d). <br /> 2. Interruption of Service. The Grantee shall interrupt service only for good cause <br /> and for the shortest time possible. Such interruption shall occur during periods of minimum use <br /> of the System. If service is interrupted for a total period of more than forty eight (48) hours in <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.