Laserfiche WebLink
any thirty (30) day period, Subscribers shall be credited pro rata for such interruption, upon <br /> request. <br /> 3. Technical Standards. The technical standards used in the operation of the System <br /> shall comply, at minimum, with the technical standards promulgated by the FCC relating to <br /> Cable Systems pursuant to Title 47, Sections 76.601 to 76.617, as applicable, as may be <br /> amended or modified from time to time, which regulations are expressly incorporated herein by <br /> reference. <br /> 4. Special Testing. <br /> a. The City shall have the right to inspect all construction or installation work <br /> performed pursuant to the provisions of the Franchise. In addition, the <br /> City/Commission may require special testing of a location or locations within the <br /> System if there is a particular matter of controversy or unresolved complaints <br /> regarding such construction or installation work or pertaining to such location(s). <br /> Demand for such special tests may be made on the basis of complaints received or <br /> other evidence indicating an unresolved controversy or noncompliance. Such <br /> tests shall be limited to the particular matter in controversy or unresolved <br /> complaints. The City shall endeavor to so arrange its request for such special <br /> testing so as to minimize hardship or inconvenience to Grantee or to the <br /> Subscribers caused by such testing. <br /> b. Before ordering such tests, Grantee shall be afforded thirty (30) days following <br /> receipt of written notice to investigate and, if necessary, correct problems or <br /> complaints upon which tests were ordered. The City shall meet with Grantee <br /> prior to requiring special tests to discuss the need for such and, if possible, <br /> visually inspect those locations which are the focus of concern. If, after such <br /> meetings and inspections, City wishes to commence special tests and the thirty <br /> (30) days have elapsed without correction of the matter in controversy or <br /> unresolved complaints, the tests shall be conducted at Grantee's expense by a <br /> qualified engineer selected by City and Grantee, and Grantee shall cooperate in <br /> such testing. <br /> 5. Drop Testing and Replacement. The Grantee shall replace, at no separate charge <br /> to an individual Subscriber, all Drops and/or associated passive equipment incapable of passing <br /> the full System capacity at the time a Subscriber upgrades. <br /> 6. FCC Reports. The results of any tests required to be filed by Grantee with the <br /> FCC shall upon request of City also be filed with the City or its designee within ten (10) days of <br /> the conduct of such tests. <br /> 7. Interconnection. The System servicing the Cities of Arden Hills,Falcon Heights, <br /> Lauderdale, Little Canada, Mounds View,New Brighton, North Oaks, Roseville, and St. <br /> Anthony shall continue to be completely interconnected. In addition, Grantee shall make <br /> available for interconnection purposes one (1) channel for forward video purposes, one (1) six <br /> 14 <br />