My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
12-21-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 4:13:19 PM
Creation date
12/18/2015 4:10:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 21 <br /> <br />In November 2012, the City of Arden Hills and Ramsey County entered into a Joint <br />Powers Agreement which establishes a framework for collaboration between the City <br />and County. The JPA requires the City to prepare an AUAR and Master Plan within 18 to <br />24 months. The Master Plan must be approved by both the City and the County and will <br />be implemented by the Joint Development Authority (JDA) which is a governing entity <br />created by the JPA. Of the five members of the JPA board, two will be County <br />Commissioners and two will be City Councilmembers. The Chair of the board will be an <br />Arden Hills resident appointed by the City Council. <br /> <br />The JPA requires that the County construct a spine road connecting Highway 96 and <br />Highway Avenue at I-35W, which will provide the only two access points to the site. The <br />City will be responsible for serving the site with trunk utilities. The City and County will <br />cooperate on construction of any necessary regional stormwater ponding. The City will <br />be reimbursed for its infrastructure expenditures through special assessments to <br />developers and/or property owners. <br /> <br />The JDA will implement a developer Request for Proposals (RFP) process to facilitate site <br />development. The JDA will review and approve development proposals. The City will <br />assign staff to oversee the JDA development review process. <br /> <br />E. Existing Planning and Other Documents. The following documents are available on the <br />City’s website. <br />• Vento Plan <br />• Framework Vision, dated March 9, 2005 <br />• Composite plan, dated July 19, 2007 <br />• Draft Transportation Study, dated August 29, 2007 <br />• Draft AUAR, dated September 24, 2007 <br />• Final Environmental Assessment, dated January 26, 2011 <br />• Environmental Condition Map, dated October 2011 <br />• Abatement, Demolition, and Remediation Contract, dated February 7, 2012 <br />• Market Analysis, dated February 2013 (to be posted once available) <br />• Comprehensive Plan excerpts (entire document available at <br />www.cityofardenhills.org) <br />• TCAAP Zoning Ordinance summary (entire document available at <br />www.cityofardenhills.org) <br />• Record drawings for the existing trunk sanitary sewer system (1993 improvements) <br />• Sanitary Sewer Connection and Use Agreement between Mounds View, Arden Hills, <br />and the U.S. Department of the Army <br /> <br /> <br />III. Scope of Work <br /> <br />Task 1.0 Alternative Urban Areawide Review (AUAR). The AUAR will include the <br />coordination of all professional activities necessary to fully complete and process the AUAR in <br />accordance with applicable Minnesota rules and statutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.