My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, 2011 PMP Feasibility Report
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4D, 2011 PMP Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:23:28 AM
Creation date
2/19/2016 4:13:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />, <br />,� <br />, <br />Janet Court <br />Janet Court is a 34 foot wide roadway with concrete curb and gutter that lies within a 50-SS foot <br />right-of-way and is 382 feet long (0.12 mile). Janet Court terminates at its east end with a cul-de- <br />sac. The roadway shows signs of distress such as transverse cracking, alligator crackizig, and <br />deterioration of the pavement surface. City records indicate that this roadway was originally <br />constructed in 1977 and was seal coated in 2001. The roadway is rated as a marginal condition. <br />' Nursery Hill Court <br />Nursery Hill Court is a 34 foot wide roadway with concrete curb and gutter that lies withzn a 60 <br />foot right-of-way and is 565 feet long (0.11 mile). Nursery Hill Court terminates at its east and <br />' west ends with a cul-de-sac. The roadway shows signs of distress such as transverse cxacking, <br />potholes, and deterioration of the pavement surface. City records indicate that this roadway was <br />originally constructed in 1979 and was milled and overlaid in 1993. Since the mill and overlay, <br />� maintenance activities for Nursery Hill Court include pothole patching, skin patching, anc� seal <br />coating. The roadway is rated as a marginal condition. <br />' Nursery Hill Lane <br />Nursery Hill Lane is a 26 foot wide roadway that extends from Hamline Avenue to the east for <br />713 feet where it contains a"bubble" cul-de-sac. From this location, the roadway width �;�anges <br />' to 34 feet wide and extends to the southeast and connects with Nursery Hill Court. T�ie entire <br />roadway has concrete curb and gutter that lies within a 60 foot right-of-way and is 1,205 feet <br />long (0.23 mile). The roadway shows signs of distress such as transverse cracking, potholes, and <br />' deterioration of the pavement surface. City records indicate that this roadway was originally <br />constructed in three separate segments in 1974, 1977, and 1979; and the entire roadway was <br />milled and overlaid in 1993. Since the mill and overlay, maintenance activities for Nursery Hill <br />, Lane include pothole patching, skin patching, and seal coating. The roadway is rated as a <br />marginal condition. <br />Wyncrest Court <br />Wyncrest Court is a 43 foot wide roadway that extends from Hamline Avenue to the east and <br />connects to Wynridge Drive. From this location, the roadway width changes to 34 feet wide and <br />terminates at its east end with a cul-de-sac adjacent to Cummings Park. The entire roadway has <br />concrete curb and gutter that lies within a 60-70 foot right-of-way and is 1,333 feet long (0.25 <br />mile). The roadway shows signs of distress such as transverse cracking, alligator cracking, and <br />deterioration of the pavement surface. City records indicate that this roadway was originally <br />constructed in 1979 and was milled and overlaid in 1993. Since the mill and overlay, <br />maintenance activities for Wyncrest Court include skin patching, crack sealing, and seal coating. <br />The roadway is rated as a problem/marginal condition. <br />Wyncrest Lane <br />Wyncrest Lane is a 34 foot wide roadway with concrete curb and gutter that lies within a 60 foot <br />right-of-way and is 630 feet long (0.12 mile). The roadway shows signs of distress �uch as <br />transverse cracking and deterioration of the pavement surface. City records indicate that tl�is <br />roadway was originally constructed in 1979 and was milled and overlaid in 1993. Since the mill <br />and overlay, maintenance activities for Wyncrest Lane include skin patching, crack sealing, and <br />seal coating. The roadway is rated as a marginal condition. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.