My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, 2011 PMP Feasibility Report
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4D, 2011 PMP Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:23:28 AM
Creation date
2/19/2016 4:13:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amble Road <br />Amble Road is a 24 foot wide rural section roadway that lies within a 60 foot right-of-way and is <br />1,288 feet long (0.24 mile). At the east end of Amble Road is a small turn-around area. The <br />roadway shows signs of distress such as transverse cracking, alligator cracking, potholes, and <br />deterioration of the pavement surface. City records indicate that this roadway was ariginally <br />constructed in 1972 and was milled and overlaid in 1993. Since the mill and overlay, <br />maintenance activities for Amble Road include pothole patching, skin patching, crack sealing, <br />and seal coating. The roadway is rated as a marginal condition. <br />Arden View Court Arden View Drive, and Arden View Drive Ent/Exit <br />Arden View Court and Arden View Drive are both 29 foot wide roadways with concrete curb <br />and gutter and lie within 60 foot rights-of-way. Arden View Court is 928 feet long (0.18 mile) <br />and Arden View Drive is 2,132 feet long (0.40 mile). At the south end of Arden View Court is a <br />cul-de-sac that contains a landscaped island. The entrance and exit roadways are both 22 feet <br />wide with concrete curb and gutter, lie within a combined 100 foot wide right-of-way, and are <br />separated with a landscaped median. The Arden View Drive entrance is 227 feet long (0.04 <br />Mile) and the Arden View Drive exit is 167 feet long (0.03 mile). <br />All of the roadways in the Arden View neighborhood show signs of distress such as transverse <br />cracking, alligator cracking, potholes, and deterioration of the roadway edge. In addition, there is <br />a substantial amount of concrete curb that is deteriorated and settled along the roadways. City <br />recards indicate that these roadways were originally constructed between 1972-1975 and were <br />milled and overlaid in 1993. Since the mill and overlay, maintenance activities for this <br />neighborhood include pothole patching, roadway edge patching, crack sealing, and seal coating. <br />The roadways are rated as a problem/marginal condition. <br />Colleen Court <br />Colleen Court is a 34 foot wide roadway with concrete curb and gutter that lies within a 60 foot <br />right-of-way and is 382 feet long (0.07 miie). Colleen Court terminates at its east end with a cul- <br />de-sac. The roadway shows signs of distress such as transverse cracking, alligator cracking, <br />potholes, and deterioration of the pavement surface. City records indicate that this roadway was <br />originally constructed in 1994 and was seal coated in 2003. In addition, a substantial amount of <br />pothole patching and skin patching maintenance has been performed on the middle segment of <br />the roadway. The roadway is rated as an adequate condition; however, this roadway's <br />deterioration has accelerated since it was rated in 2008 and City staff recommends that Colleen <br />Court be rated as a marginal condition. <br />Dellwood Street <br />Dellwood Street is a 34 foot wide roadway with concrete curb and gutter that lies within a 60 <br />foot right-of-way and is 448 feet long (0.08 mile). The roadway shows signs of distress such as <br />transverse cracking, potholes, and deterioration of the pavement surface. City records indicate <br />that this roadway was originally constructed in 1979 and was milled and overlaid in 1993. Since <br />the mill and overlay, maintenance activities for Dellwood Street include pothole patching and <br />seal coating. The roadway is rated as a marginal condition. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.