My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-29-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
02-29-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:38:19 PM
Creation date
2/26/2016 3:36:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – February 3, 2016 2 <br /> <br />Additionally, 26 parking stalls within the lot will need to be removed for the construction of the <br />skyway. Boston Scientific has accounted for these stalls in the “proof of parking” calculation for <br />the overall campus parking plan. The proposal includes regrading of the land adjacent to <br />Innovation Way to allow for an at-grade sidewalk connection to the skyway from Building 14 to <br />the north. The area adjacent to the skyway and along the sidewalk to Building 14 would be <br />landscaped with new trees and perennials. <br /> <br />Senior Planner Bachler noted that with the completion of the skyway, the temporary at-grade <br />enclosed pedestrian walkway between Buildings 3 and 10 will be removed. Under the existing <br />Agreement to Terminate Use, Boston Scientific is required to remove the walkway by February <br />1, 2019. Boston Scientific has stated that their goal is to complete the construction of the skyway <br />and removal of the walkway within 24 months of receiving Site Plan Review approval. Boston <br />Scientific is requesting planning level approval to allow for flexibility in scheduling several <br />potential projects on the campus. <br /> <br />Site Data <br />Land Use Plan: Light Industrial and Office <br />Existing Land Use: Light Industrial and Office <br />Zoning: I-1: Limited Industrial / PUD Overlay <br />Current Lot Sizes: Lot 1: 77.4 Acres <br />Proposed Density: N/A <br />Topography: Level <br /> <br />Senior Planner Bachler reviewed the surrounding area and the Site Plan Review. <br /> <br />Senior Planner Bachler provided the Findings of Fact for review: <br /> <br />1. Boston Scientific has requested approval for a Site Plan Review to construct a skyway <br />connection between Buildings 3 and 10 and to complete minor modifications to the <br />parking lot on the north side of Building 10 at 4100 Hamline Avenue North. <br />2. Boston Scientific has requested an extension for the March 1, 2016 deadline for the <br />submittal of a Site Plan Review for the modification of the parking area along the Lot 1 <br />and Lot 2 property line and the submittal of a building permit for the removal of the <br />existing skyway between Buildings B and E, as required by the conditions of approval in <br />Planning Case 15-001. <br />3. The Boston Scientific Campus is a conforming use in the I-1 Limited Industrial Zoning <br />District and operates under an approved PUD. <br />4. New building construction or site modifications identified on the approved Campus <br />Master Plan require the submittal of a Site Plan Review application prior to construction. <br />5. The location of the proposed skyway and the proposed modifications to the parking lot <br />north of Building 10 are generally consistent with the approved Campus Master Plan. <br />6. A 4,147 gross square foot addition to Building 10 would be required to tie the skyway <br />into the established internal circulation of the building. <br />7. The proposal is in conformance with underlying I-1 Zoning District requirements and the <br />approved PUD. <br />8. The proposed modifications to the Building 10 parking lot include the removal of 26 <br />parking stalls.
The URL can be used to link to this page
Your browser does not support the video tag.