ARDEN HILLS PLANNING COMMISSION – February 3, 2016 3 <br /> <br />9. Boston Scientific has accounted for these removed stalls with an additional 26 “proof of <br />parking” spaces in the Campus Parking Plan. <br />10. The proposal is not expected to adversely affect the surrounding neighborhood or the <br />community as a whole. <br /> <br />Senior Planner Bachler stated that based on the submitted plans and findings of fact, staff <br />recommends approval of Planning Case 16-004 for a Site Plan Review to construct a skyway <br />between Buildings 3 and 10 and complete minor modifications to the parking lot on the north <br />side of Building 10 at 4100 Hamline Avenue North. If the Planning Commission recommends <br />approval of this request, staff recommends that the following twelve (12) conditions be included <br />with the approval: <br /> <br />1. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City <br />Council. <br />2. The applicant shall continue to abide by all previous Development Agreements, Master <br />PUD approvals, and subsequent PUD Amendment approvals. <br />3. All necessary City permits for the construction of the skyway and modifications to the <br />parking lot on the north side of Building 10 shall be obtained by September 1, 2017, or an <br />extension request shall be submitted in writing to the City at least forty-five (45) days <br />prior to the expiration date. <br />4. Final construction plans shall be subject to approval by the City Building Official, City <br />Engineer, and Fire Marshall prior to the issuance of a Building Permit. <br />5. Final grading, drainage, and utility plans shall be subject to approval by the City Engineer <br />prior to the issuance of a Grading and Erosion Control Permit. <br />6. The existing temporary at-grade enclosed pedestrian walkway between Buildings 3 and <br />10 shall be removed within sixty (60) days of the skyway connection receiving final <br />approval by the City Building Official. <br />7. The applicant shall submit a financial surety in the amount of 125% of the estimated costs <br />of landscaping prior to the issuance of any development permits. The financial surety <br />shall be in the form of a letter of credit issued by a FDIC-insured Minnesota bank. The <br />purpose of the letter of credit is to ensure that landscaping is completed in the event that <br />the Developer defaults on this Agreement. The City will hold the letter of credit for two <br />years after the installation of landscaping. The letter of credit should not expire during the <br />two-year period. <br />8. A Site Plan Review application, including a Landscaping Plan, is required for the <br />modification of the parking area along the Lot 1 and Lot 2 property boundary line and <br />shall be submitted within ninety (90) days of the sale of Lot 1 by Boston Scientific, or an <br />extension request shall be submitted in writing to the City at least forty-five (45) days <br />prior to that date. <br />9. All necessary City permits for the removal of the existing skyway structure connecting <br />Building B and Building E as depicted on the current Campus Master Plan shall be <br />obtained within ninety (90) days of the sale of Lot 1 by Boston Scientific, or an extension <br />request shall be submitted in writing to the City at least forty-five (45) days prior to that <br />date. <br />10. All plantings in the bio-filtration area adjacent to the parking lot to the north of Building <br />10 shall be shade-tolerant species.