Laserfiche WebLink
3 <br />185736v1 <br /> F. The existing temporary at-grade enclosed pedestrian walkway between Buildings <br />3 and 10 shall be removed within sixty (60) days of the skyway connection receiving final <br />approval by the City Building Official. <br /> <br /> G. The applicant shall submit a financial surety in the amount of 125% of the <br />estimated costs of landscaping prior to the issuance of any development permits. The financial <br />surety shall be in the form of a letter of credit issued by a FDIC-insured Minnesota bank. The <br />purpose of the letter of credit is to ensure that landscaping is completed in the event that the <br />Developer defaults on this Agreement. The City will hold the letter of credit for two years after <br />the installation of landscaping. The letter of credit should not expire during the two-year period. <br /> <br /> H. A Site Plan Review application, including a Landscaping Plan, is required for the <br />modification of the parking area along the Lot 1 and Lot 2 property boundary line and shall be <br />submitted within ninety (90) days of the sale of Lot 1 by Boston Scientific, or an extension <br />request shall be submitted in writing to the City at least forty-five (45) days prior to that date. <br /> <br /> I. All necessary City permits for the removal of the existing skyway structure <br />connecting Building B and Building E as depicted on the current Campus Master Plan shall be <br />obtained within ninety (90) days of the sale of Lot 1 by Boston Scientific, or an extension request <br />shall be submitted in writing to the City at least forty-five (45) days prior to that date. <br /> <br /> J. All plantings in the bio-filtration area adjacent to the parking lot to the north of <br />Building 10 shall be shade-tolerant species. <br /> <br /> K. A building permit shall be required for the retaining wall and fence adjacent to the <br />sidewalk connection to Building 14. A structural analysis of the retaining wall shall be provided <br />to show, to the satisfaction of the City Engineer, that there are no issues with the construction of <br />the retaining wall on top of the existing sanitary sewer line. <br /> <br /> L. The applicant shall obtain all necessary permits, including, but not limited to, <br />NPDES and Rice Creek Watershed District. Copies of all necessary permits shall be submitted <br />to the City prior to the issuance of any development permits. <br /> <br />6. ACKNOWLEDGMENT/COMPLIANCE. Boston Scientific acknowledges and <br />understands the conditions of approval and agrees to comply with such conditions. <br /> <br /> IN WITNESS WHEREOF, the parties have caused this Amendment to be executed as <br />of the date and year first above written. <br /> <br /> <br /> <br />[Remainder of page intentionally left blank. <br />Signatures contained on the following pages.] <br />