Laserfiche WebLink
Z, Block 1, Arden Village ("Final Pla�'); a Comprehensive Plan Amendment for <br />Proposed Lot 1, Block 1, Arden Village to allow such Lots to be used for <br />multiple family purposes ("Comprehensive Plan Amendment"); a Rezoning of <br />Proposed Lot 1, Block 1, Arden Village from I-1 to R-4 ("Rezoning"); and <br />Amendment ta Conditional Use Permit for Planning Case 72-024 to reduce <br />the size of the parcel restricted by the conditions of such permit ("Conditional <br />Use Permit Amendmen�'); for a combined Planned Unit Development <br />Master/Final PIan which wauld apply to propQsed Lot 1, Block 1, Arden <br />Village ("PUD Plan"); all of which requests are herein referred to as the <br />"Arden Village Application". <br />E. <br />On the 18th day of February, the period for reviewing the Arden Village <br />AppIication was extended to the 23rd day of Mareh, 2010. <br />F. The Arden Village Application is illustrated and ciescribed on the following <br />documents ("Arden Village Redevelopment Plan Documents") attached and <br />incorporated herein. <br />1. <br />Z. <br />3. <br />4. <br />5. <br />6. <br />?. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />Preliminary Plat dated 11/02/49; <br />Grading and Paving Plan dated 11/Q2/09; <br />Utility Plan dated 11/02/09; <br />Trail Construction Plan dated 11/02/09; <br />Erosion Control Plan dated 11/02/09; <br />SiNV1iWP Narrative dated 11/02/09; <br />Existing Drainage Plan dated 11/02/09; <br />Proposed Drainage Plan dated 11/02/09; <br />Photometric Plan dated 10/28/09; <br />Site Plan dated 10/1g/09 <br />Tree Mitigation Plan dated 10/19i09; <br />Landscape Plan dated 10/19/09; <br />Rain Garden Landscape Pian dated 10/19/09; <br />Exterior Elevations dated 10/19/09; <br />Written Statement consisting of pages 1-3 dated 11/02/09. <br />z <br />� <br />