My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-16 Joint WS with PTRC
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
03-21-16 Joint WS with PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 3:05:39 PM
Creation date
3/18/2016 3:02:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 1 to Cost Sharing Agreement for Consulting Services <br />(TCAAP Redevelopment Infrastructure Development and Design) <br /> 2 of 4 <br />211519v4 <br />Responsible/Lead Party: County <br />Shared: 50% County, 50% City <br />Total Cost: $19,800; $9,900 County, $9,900 City <br /> <br />Section 13. Stormwater Preliminary Design. The parties intend to allocate Consultant costs for <br />Stormwater Preliminary Design, RFP Task 3, 50% County, 50% City as in the Agreement. The <br />Consultant cost for Task 3 has increased from the original cost of $77,940 to $124,605. The <br />increase of $46,665 is due to additional design work performed by the Consultant to meet the <br />requirements of the stormwater permitting agency, the Rice Creek Watershed District, and will be <br />shared as follows: <br /> <br />Responsible/Lead Party: County <br />Shared: 50% County, 50% City <br />Total Cost: $46,665; $23,332.50 County, $23,332.50 City <br /> <br />Section 14. Spine Road and Public Utilities Final Design. The Parties intend to allocate the <br />Consultant costs for Spine Road and Public Utilities Final Design, RFP Task 11: <br /> <br />Responsible/Lead Party: County <br />Shared: 78% County, 22% City <br />Total Cost: $899,240; $701,407 County, $197,833 City <br /> <br />Section 15. Thumb Road and Public Utility Design. The Parties intend to allocate the Consultant <br />costs for Thumb Road and Public Utility Design, Task 17: <br /> <br />Responsible/Lead Party: County <br />Shared: 70% County, 30% City <br /> Total Cost: $144,540; $101,178 County, $43,362 City <br /> <br />Section 16. Water Tower and Booster Station Final Design. It was determined during preliminary <br />design of the water system that a water tower and booster station would be required to <br />accommodate water demand generated by the New Development. Additional design work beyond <br />what was included in the original scope of water system design is required, including additional <br />modeling to determine if water tower storage requirements can be reduced and at what stage of <br />development the water tower would be required. The parties intend to allocate the Consultant costs <br />for Water Tower and Booster Station Final Design, Task 23: <br /> <br /> Responsible/Lead Party: City <br /> Total Cost: $15,000 <br /> <br />Section 17. Lift Station Final Design. It was determined during preliminary design of the sanitary <br />sewer that a lift station would be required to accommodate sanitary sewer service to the New <br />Development. The Parties intend to allocate the Consultant costs for Lift Station Final Design, <br />Task 24: <br /> <br /> Responsible/Lead Party: City <br /> Total Cost: $47,500
The URL can be used to link to this page
Your browser does not support the video tag.