Laserfiche WebLink
I-694 NON-MOTORIZED CROSSING STUDY PAGE 13 <br />Table 1: I-694 Existing and Potential Crossings Summary of Existing Conditions (2014) <br />MAP <br />REFERENCE <br />CROSSING <br />LOCATION <br />CITY <br />(LOCATION) <br />ROADWAY <br />JURISDICTION <br />(OWNERSHIP) <br />PEDESTRIAN <br />FACILITY <br />BICYCLE FACILITY CONNECTION TO TRAILS / <br />SIDEWALKS <br />EXISTING TRANSIT <br />ROUTE <br />AVG. DAILY TRAFFIC <br />VOLUMES <br />MOTOR VEHICLE <br />SPEED LIMIT <br />PLANS FOR FUTURE IMPROVEMENTS <br />1 <br />Silver Lake <br />Road (CSAH <br />44) <br />New Brighton Ramsey County 8 ft. sidewalk <br />(east side)None Sidewalk on east side of roadway Yes; Park and ride south <br />of I-694 12,700 40 mph <br />• Bridge is in good condition, no near term plans for improvements. <br />• City of New Brighton Comprehensive Plan shows proposed multi- <br />use path along entire corridor. <br />2 <br />Long Lake <br />Road (CSAH <br />45) <br />New Brighton Ramsey County 6 ft. sidewalk <br />(east side)Shoulder <br />Bike lane north of bridge through <br />study area; Sidewalks north and <br />south of I-694 <br />No 6,700 30 mph <br />• Bridge is in good condition, no near term plans for improvements. <br />• City of New Brighton Comprehensive Plan shows proposed multi- <br />use path south of I-694 <br />3 Old Highway 8 <br />(CSAH 77)New Brighton Ramsey County 5 ft. sidewalk <br />(west side)None Sidewalks north and south of I-694 <br />on west side <br />Yes; Park and ride north <br />of study area at County <br />Road H <br />10,000 30 mph (south); 40 mph <br />(north) <br />• Bridge is in good condition, no near term plans for improvements. <br />• City of New Brighton Comprehensive Plan shows proposed multi- <br />use path along the corridor. <br />4 <br />Old Highway 10 <br />/ Old Snelling <br />(CSAH 76) <br />Arden Hills Ramsey County None Shoulder <br />Shoulder continues for length of <br />the corridor (except near Valentine <br />Lake); No sidewalk <br />No 2,550 45 mph <br />• City of Arden Hills Comprehensive Plan shows planned shared use <br />path along the corridor. <br />• Space for shared use path was provided in I-694 North Central <br />Project, City is actively pursuing funding for trail construction. <br />5 TH 51 Arden Hills MnDOT None Intermittent shoulder Intermittent shoulder throughout <br />corridor No 31,500 55 mph • Planned trail in Arden Hills Comprehensive Plan. <br />6 <br />Lexington <br />Avenue (CSAH <br />51) <br />Arden Hills; <br />Shoreview Ramsey County 10 ft. shared use <br />path (east side) <br />10 ft. shared use <br />path (east side) <br />Trail on east side of Lexington, <br />operated by City of Shoreview Yes 21,400 40 mph <br />• Planned trail on west side of Lexington from 694 to County F. <br />• Identified as a regional trail search corridor in Regional Parks <br />Policy Plan. <br />7 Victoria Street <br />(CSAH 52)Shoreview Ramsey County 10 ft. shared use <br />path (west side) <br />10 ft. shared use <br />path (west side); <br />shoulder (west side) <br />Trail on west side of Victoria; <br />Shoulders north of I-694 <br />Yes; Park and ride at <br />Victoria and CSAH 96 14,300 40 mph • Bridge is in good condition, no near term plans for improvements. <br />8 Grass Lake Rail Shoreview Shoreview 12 ft. shared use <br />path <br />12 ft. shared use <br />path <br />Connects to Grass Lake Trail (north); <br />County Road E to west (shoulder)NA NA NA • Bridge is in good condition, no near term plans for improvements. <br />9 Rice Street <br />(CSAH 49) <br />Shoreview; <br />Little Canada; <br />Vadnais Heights <br />Ramsey County None None <br />Shoulders north and south of 694 <br />Intermittent sidewalk north of 694; <br />Sidewalk 1/4 mile south of 694 <br />Yes 17,400 40 mph <br />• County is seeking funding for new interchange that would include <br />improved ped/bike facilities. No near term plans to replace or <br />redeck the bridge for structural purposes. <br />• Planned Trail along west side of Rice Street in Shoreview <br />Comprehensive Plan. <br />10 (Potential <br />Future) <br />Trout Brok <br />Regional Trail <br />Shoreview; <br />Little Canada NA NA NA Would connect to Trout Brook <br />Regional Trail through St. Paul NA NA NA <br />• Potential crossing and feasibility is currently being explored <br />through the Trout Brook Trail North Master Plan led by Ramsey <br />County. <br />• Crossing not identified in adopted comprehensive plan. <br />11 (Potential <br />Future) <br />St. Anthony <br />Railroad Spur Little Canada BNSF Railroad NA NA NA NA NA • Crossing not identified in adopted comprehensive plan, railroad is <br />still active <br />12 Edgerton Street <br />(CSAH 58) <br />Vadnais Heights; <br />Little Canada Ramsey County 8 ft. sidewalk Shoulders <br />Existing shoulder along corridor; <br />Shared use path on east side for <br />short distance north of I-694 <br />Yes (south of I-694); Park <br />and ride on County Road <br />C near Edgerton <br />7,400 40 mph • Vadnais Heights shows proposed shared use trail in <br />Comprehensive Plan. <br />13 Labore Road <br />(County 108) <br />Vadnais Heights; <br />Little Canada Ramsey County 8 ft. sidewalk Shoulders Shoulders north and south of I-694; <br />Segment north of I-694 No 3,200 35 mph • Little Canada shows proposed shared use path along Labore Road <br />in Comprehensive Plan.