Laserfiche WebLink
I-694 NON-MOTORIZED CROSSING STUDY PAGE 14 <br />Table 1: I-694 Existing and Potential Crossings Summary of Existing Conditions (2014) (continued) <br />MAP <br />REFERENCE <br />CROSSING <br />LOCATION <br />CITY <br />(LOCATION) <br />ROADWAY <br />JURISDICTION <br />(OWNERSHIP) <br />PEDESTRIAN <br />FACILITY <br />BICYCLE FACILITY CONNECTION TO TRAILS / <br />SIDEWALKS <br />EXISTING TRANSIT <br />ROUTE <br />AVG. DAILY TRAFFIC <br />VOLUMES <br />MOTOR VEHICLE <br />SPEED LIMIT <br />PLANS FOR FUTURE IMPROVEMENTS <br />14 TH 61 Vadnais Heights MnDOT None Intermittent shoulder Intermittent shoulder No; Park and ride at <br />County Road C 30,500 50 mph <br />15 Bruce Vento <br />Regional Trail <br />Vadnais Heights; <br />Maplewood; <br />White Bear Lake <br />Ramsey County <br />Regional Rail Shared use path Shared use path Bruce Vento Regional Trail NA NA NA • City of White Bear Lake and Ramsey County pursuing expansion <br />of trail to the north from Buerkle Rd. to CSAH 96 <br />16 <br />White Bear <br />Avenue (CSAH <br />65) <br />White Bear Lake; <br />Maplewood Ramsey County Sidewalk (both <br />sides)None Continuous sidewalk on both sides of <br />roadway <br />Yes; Maplewood Mall <br />Transit Center 35,500 40 mph <br />17 McKnight Road <br />(CSAH 68) <br />White Bear Lake; <br />Maplewood Ramsey County 5 ft. sidewalk <br />(east side)None <br />Trail on west side of roadway north of <br />I-694; Trail on east side of roadway <br />south of I-694 <br />Yes 7,000 30 mph • Bridge is in good condition, no near term plans for improvements. <br />18 TH 120 <br />White Bear Lake; <br />Maplewood; <br />North St. Paul <br />MnDOT <br />5 ft. sidewalk <br />(both sides); <br />Missing sidewalk <br />at bridge <br />approach <br />None Shoulder on west side of roadway; <br />Sidewalks near Century College Yes 16,300 40 mph <br />• Bridge is in good condition, no near term plans for improvements. <br />• Recent mobility study of TH 120 in this area did not provide specific <br />recommendations for pedestrian and bicycle travel. <br />• Lake Links Trail Master Plan identifies future trail south of I-694 <br />along the west side of TH 120. Plan also identifies a seperate bike/ <br />ped bridge across I-694 east of TH 120.