Laserfiche WebLink
I-694 NON-MOTORIZED CROSSING STUDY PAGE 26 <br />County Road E2 trail gaps (map reference M) — The 2016 MnDOT project to reconstruct the County Road E2 bridge over I-35W will include a <br />shared use trail and 6 foot shoulder on the south side of the bridge and an 8 foot shoulder on the north side. County Road E2’s value for broader <br />east/west connectivity is limited by the fact that it does not cross the railroad tracks west of I-35W. The corridor does provide a connection to the <br />industrial employers in New Brighton before terminating at the railroad tracks. It also provides a connection to the Elmer Andersen Trail, Tony Schmidt <br />Regional Park, and Valentine Hills Elementary School on the east side of I-35W. Planned Ramsey County trail improvements will fill gaps in the Elmer <br />Andersen Regional Trail (Project G), which will provide trail access between County Road E2 and Tony Schmidt Regional Park as well as a north/south <br />connection to County Road F. <br />County Road E trail (map reference N) — The City of Arden Hills has a planned trail connection along County Road E west of TH 51 to Old Snelling. <br />This connection would build upon recent investments along County Road E (the new TH 51 bridge and on-street bikeway improvements west of the <br />bridge) by extending a pedestrian and bicycle facility east toward destinations such as Bethel University and Lake Johanna. If a trail connection along <br />Old Snelling is constructed, this connection becomes even more significant as it will provide access to Bethel University from areas south and east. <br />County Road E is also within a Met Council designated Tier 1 RBTN corridor. <br />Table 2: West Study Area Opportunity Projects <br />MAP <br />REFERENCE <br />DESCRIPTION NOTES STATUS / <br />TIMING <br />AGENCIES <br />A <br />Highway 10 / <br />Highway 96 Grade <br />Separation <br />• Converted signalized intersection into partial interchange. <br />• Extends Highway 96 Regional Trail to the west <br />• Includes shoulders on Hwy 96 <br />• Includes sidewalk on the north side of Hwy 96 <br />Completed <br />Fall 2013 <br />MnDOT; <br />Ramsey County; <br />Arden Hills <br />B I-35W / Highway 96 <br />Interchange <br />• Full interchange reconstruction, changing to a diverging diamond <br />interchange (DDI) <br />• Extends Highway 96 Regional Trail to Old Highway 8 <br />Completed <br />2015 <br />Ramsey County; <br />MnDOT; <br />Arden Hills; <br />New Brighton <br />C <br />I-35W / County <br />Rd F Bridge <br />Replacement <br />• Complete bridge replacement provides opportunity to include <br />pedestrian and bicycle connections across I-35W <br />• Will connect New Brighton Community Center on west side to <br />Mounds View High School on east side <br />• Proposed bridge will have a 10’ shared use path on the south <br />(eastbound) side of the bridge with a 6’ shoulder on the north <br />(westbound) side of the bridge. <br />Completed <br />2015 <br />MnDOT; <br />Ramsey County; <br />Arden Hills; <br />New Brighton <br />D <br />I-35W / County <br />Rd E2 Bridge <br />Replacement <br />• Complete bridge replacement provides opportunity to include <br />pedestrian and bicycle connections across I-35W <br />• Current bridge concept shows a 10’ shared use path and 4’ <br />shoulder on the south (eastbound) side of the bridge with a 6’ <br />shoulder on the north (westbound) side of the bridge. <br />2016 <br />MnDOT; <br />Ramsey County; <br />Arden Hills; <br />New Brighton <br />E <br />TH 51 / County <br />Rd E Bridge <br />Replacement <br />• Complete bridge replacement includes plans for trail and <br />sidewalk across TH 51.2015 <br />MnDOT; <br />Ramsey County; <br />Arden Hills <br />F County Rd E <br />Resurfacing <br />• Roadway maintenance project will reconfigure center median to <br />allow wider shoulders for bicyclists. <br />• Project will connect to new bridge over TH 51 (project E). <br />2014 Ramsey County <br />Public Works