Laserfiche WebLink
I-694 NON-MOTORIZED CROSSING STUDY PAGE 27 <br />MAP <br />REFERENCE <br />DESCRIPTION NOTES STATUS / <br />TIMING <br />AGENCIES <br />G Elmer Anderson <br />Trail <br />• Fill in trail gaps between County Road E2 and Tony Schmidt <br />Regional Park and gap from Venus Avenue to Lake Valentine <br />Road (County F). <br />Unknown Ramsey County <br />Parks <br />H <br />I-35W / County <br />Rd H Bridge <br />Replacement <br />• Ramsey County is leading this project and currently developing <br />the proposed bridge design. Exact details have not been <br />determined, but a trail connection is proposed on both sides of <br />the bridge. <br />2016 <br />Ramsey County; <br />MnDOT; <br />Arden Hills; <br />New Brighton <br />I <br />Rice Creek <br />Commons <br />Redevelopment <br />• Proposed redevelopment includes trail connections into study <br />area. <br />Unknown; <br />Master plan <br />underway <br />Ramsey County; <br />Arden Hills <br />Figure 8: West Study Area Opportunity Projects and Recommendations <br />Turtle <br />Long <br />Johanna <br />Round <br />Pike <br />Rush <br />Valentine <br />Jones <br />L e x i n g t o n <br />L o n g L a k e <br />Highway 96 <br />S i l v e r L a k e <br />C l e v e l a n d <br />County Rd H <br />H a m l i n e <br />County Rd F <br />Rice Creek <br />County Rd ECounty Rd E <br />U <br />S <br /> <br />H <br />w <br />y 1 <br />0 <br />H a m l i n e <br />I -3 5 W <br />I-694 <br />A <br />J <br />B <br />C <br />D <br />E F <br />G <br />H <br />I <br />K <br />L <br />M <br />N <br />6 <br />5 <br />4321 <br />0 1 2 3 40.5 Miles <br />Data: State of Minnesota, Metropolitan Council, Ramsey County <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />K <br />L <br />M <br />N <br />Highway 10 / Highway 96 Grade Separation <br />I-35W / Highway 96 Interchange <br />I-35W / County Rd F Bridge Replacement <br />I-35W / County Rd E2 Bridge Replacement <br />TH 51 / County Rd E Bridge Replacement <br />County Rd E Resurfacing <br />Elmer Andersen Trail <br />I-35W / County Rd H Bridge Replacement <br />Rice Creek Commons Redevelopment <br />Near-Term Opportunities <br />Old Highway 8 Connection <br />Old Snelling / Old Highway 10 Connection <br />County Rd F Connection <br />County Rd E2 Connection <br />County Rd E Trail <br />Future Network Needs