My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-16 Joint WS with PTRC
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
03-21-16 Joint WS with PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 3:05:39 PM
Creation date
3/18/2016 3:02:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />kimley-horn.com 2550 University Avenue West, Suite 238N, St. Paul, MN 55114 651 645 4197 <br />· Spine Road between Highway 96 and County Road H <br />· Highway 96 Traffic Signal <br />· Spine Road Bridge over Rice Creek <br />· Water Main <br />· Sanitary Sewer <br />· Storm Sewer <br />· Natural Resources Corridor Ponds, Wetlands, and Trail <br />· Regional Trail between Highway 96 and County Road H <br />· Sidewalk Extension along Highway 96 <br />· Earthwork Balance/Site Grading <br />Spine Road and Public Utilities Final Design Cost:$899,240 <br />Thumb Road and Public Utility Design <br />The Thumb Road and public utility design task will include the preparation of final plans and <br />specifications for the following improvements as identified in the Preliminary Design Report: <br />· Thumb Road between County Road H and County Road I <br />· Storm Sewer <br />· Water Main Extension from County Road H to Approximately 4,600’ South <br />· Interconnect with Mounds View Water System <br />· Water Service Connection to State of Minnesota Facilities <br />Thumb Road and Public Utility Design Cost:$144,540 <br />Water Tower and Booster Station Final Design <br />Final design of the water tower and booster station will require additional water system modeling <br />from that completed with the preliminary design. The City of Arden Hills has expressed interest in <br />adjusting the preliminary water system design parameters in an attempt to reduce the elevated <br />storage requirements. Construction sequencing may leave out portions of the trunk water main <br />system requiring modeling to determine resulting fire flows. We will complete six runs of the water <br />main model to address these issues as follows: <br />· Reduced duration and/or fire flow requirement and impact on required elevated storage while <br />maintaining a minimum 20 PSI residual pressure (continue to assume worst-case low water <br />level in tower at start of fire flow event) <br />· Reduced duration and fire flow requirement and impact on required elevated storage while <br />maintaining a minimum 20 PSI residual pressure (continue to assume worst-case low water level <br />in tower at start of fire flow event) <br />· Reduced duration, reduced fire flow requirement, and adjusted assumption on the water level in <br />tower at start of fire flow event to determine the impact on required elevated storage while <br />maintaining a minimum 20 PSI residual pressure <br />·One addition iteration similar to the three previous runs <br />·Based on final tower design assumptions determined above, run analysis of one alternate trunk <br />water main layout to address potential construction sequencing
The URL can be used to link to this page
Your browser does not support the video tag.