Laserfiche WebLink
• <br />City of Arden Hills <br />Perry Park Improvements <br />Estimated Costs <br />Berm Work <br />Item <br />No. Item Unit <br />1 Mobilization LS <br />2 Berm Excavation(off site) CY <br />3 Sod w/6" topsoil SY <br />• Notes <br />• <br />Subtotal (Rounded) <br />10% Contingency <br />TOTAL PROJECT COST <br />2 Berms included in the cost <br />Berm material hauled off site <br />Minimal salvage of topsoil assumed <br />NCL 3/2/00 <br />Ouantity Unit Price Amount <br />1 $1,000.00 $1,000 <br />2,500 $6.50 $16,250 <br />2,277 $3.75 $8,540 <br />$26,000 <br />2 600 <br />$28,600 <br />