Laserfiche WebLink
A. <br />I ". <br />• <br />• <br />0 <br />City of Arden Hills <br />Hazelnut Park Improvements <br />Estimated Costs <br />Hazelnut Park <br />Warming House <br />Item <br />NCL 3/2/00 <br />No. <br />Item <br />Unit <br />Ouantity <br />Unit Price <br />Amount <br />1 <br />Mobilization <br />LS <br />1 <br />$5,000.00 <br />$5,000 <br />2 <br />Remove Old Structure <br />LS <br />1 <br />$2,000.00 <br />$2,000 <br />3 <br />4" Concrete Floor <br />SF <br />600 <br />$6.50 <br />$3,900 <br />4 <br />Concrete Footings <br />LF <br />600 <br />$6.50 <br />$3,900 <br />5 <br />Concrete Block Building <br />LS <br />1 <br />$60,000.00 <br />$60,000 <br />6 <br />Electrical Service <br />LS <br />1 <br />$5,000.00 <br />$5,000 <br />7 <br />Construct New Access <br />LF <br />200 <br />$70.00 <br />$14,000 <br />8 <br />Landscape Restoration <br />LS <br />1 <br />$1,000.00 <br />$1,000 <br />Subtotal <br />$95,000 <br />10% Contingency <br />$9,500 <br />TOTAL PROJECT COST <br />$104,500 <br />Notes: 1. The site location is too low to supply gravity sanitary sewer service <br />an ejector system would be required. (ejector system cost not included) <br />2. The cost estimate of the building does not include interior furnishings. <br />