My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-00 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2000
>
03-28-00 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 3:06:14 PM
Creation date
4/15/2016 3:49:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br />BRW <br />• ,�S ; s , A DAMES & MOORE GROUP COMPANY MEMORANDUM <br />BRW <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612)370-1378 <br />To: Tom Moore/AHills Copy: Nick Landwer File: 37951-005-8001 <br />From: Greg Brown <br />Date: March 3, 2000 <br />0 <br />Subject: Perry Park and Hazelnut Park Improvements <br />Preliminary Budget Estimates <br />Based upon previous discussions and the two field visits with your staff we have compiled <br />preliminary budget estimates for the various improvements you have identified within Perry <br />Park and Hazelnut Park. The following is a summary of the total estimated construction and <br />project costs (including 26% administration/engineering etc.). More detailed cost estimates are <br />attached. <br />A. Perry Park <br />Construction <br />Project <br />Cost <br />Cost <br />1. <br />Removal Berms and Field Restoration: <br />$28,600.00 <br />$36,000.00 <br />2. <br />Reconstruct Park Access Road: <br />$28,600.00 <br />$36,000.00 <br />3. <br />Picnic Shelter Construction <br />$83,600.00 <br />$105,000.00 <br />4. <br />Bridge Over Wetland (150' length) <br />$100,000.00 <br />$126,000.00 <br />5. <br />Grass Trail to Lift Station Road <br />$12,500.00 <br />$16,000.00 <br />6. <br />Bituminous Basketball Court <br />$20,000.00 <br />$25,000.00 <br />B. Hazelnut Park <br />1. Relocation of Warming House $104,500.00 $132,000.00 <br />Please review the attached estimates and let me know which projects you would like to proceed <br />with at this time or if you would like to consider modifications to any of the project scopes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.