Laserfiche WebLink
Public Works Department Goals City of Arden Hills Date: 4/25/16 <br />Goal Work Tasks Priority Notes <br />Hard Court replacement (Johanna  <br />Marsh) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2017 <br />hwy 96 / C.R. F sidewalk <br />obtain topography, design improvement, State aid plan review,  <br />assemble bid package, obtain bids, inspect construction, process  <br />payment <br />Medium 2017 <br />Hwy 96 Landscaping <br />identify vision for landscape along the cooridor, coordinate with  <br />TCAAP landscaping, obtain topography, design improvement,  <br />assemble bid package, obtain bids, inspect construction, process  <br />payment <br />Low 2017 <br />C.R. E / Old Hwy 10 sidewalk /trail <br />preform wetland delineation, determine flood plain impacts,  <br />coordinate preliminary layout with Ramsey county, apply for funding,  <br />state aid plan review, enviormental permit applications, coordination  <br />with property owners, assemble bid package, inspect construction,  <br />process payment <br />High 2016 <br />Hard Court replacement (Floral)Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2018 <br />Hard Court replacement (Hazelnut)Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2020 <br />Hard Court Replacement (Royal Hills)Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2019 <br />playground structure replacement  <br />(perry) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment High 2016 <br />playground structure replacement  <br />(Hazelnut) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2017 <br />playground structure replacement  <br />(freeway) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2018 <br />playground structure replacement  <br />(Cummings) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2018 <br />playground structure replacement  <br />(Arden Manor) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2019 <br />playground structure replacement  <br />(Arden Oaks) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Low 2019 <br />playground structure replacement  <br />(Ingerson) <br />Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Low 2020 <br />Trail map update / printed copies  <br />available update trail map, print maps Low 2017 <br />Update to long term trail goals PTRC recommendation, Public input, City Council Approval Medium 2016 <br />Goal Work Tasks Priority Notes <br />2017 Sewer lining project Apply for grant, identify priorities and available budget, assemble bid  <br />package, obtain bid, inspect work, process payments Medium 2017 <br />City Code update, Sanitary sewer update language related to sewer service ownership Low 2017 <br />reconstruct lift station 11 award contract, inspect work, process payment High 2016 <br />2019 Sewer lining project Apply for grant, identify priorities and available budget, assemble bid  <br />package, obtain bid, inspect work, process payments Medium 2019 <br />Goal Work Tasks Priority Notes <br />regulatory sign replacement Install signs, document instalation High 2016 <br />lexington Avenue improvement Coordinate with Ramsey County High 2016 <br />Hwy 96 / Iā€35W Bridge ā€ complete  <br />construction Coordinate with Ramsey County High 2016 <br />C.R. E2 / Iā€35W Bridge Coordinate with MnDOT High 2016 <br />C.R. H / Iā€35W Bridge Coorrdinate with Ramsey County High 2016 <br />concrete curb and gutter replacement Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment High 2016 <br />C.R. D and Shoreview Drive <br />coordinate with Johanna Shores, obtain topography, design  <br />improvement, initiate 429 assement process, assemble bid package,  <br />award construction, inspect construction, process payment <br />Medium 2017 <br />Parks <br />Sanitary Sewer <br />Streets