Laserfiche WebLink
Public Works Department Goals City of Arden Hills Date: 4/25/16 <br />Old Snelling Ave / Bridge reconstruction <br />obtain bridge funding, obtain topography, design improvement, State  <br />aid plan review, assemble bid package, obtain bids, inspect  <br />construction, process payment <br />Medium 2017 <br />Long range street project planning review city wide pavement conditions, group project areas, estimate  <br />costs, identify priorities, identify budget, assemble plan Low 2016 <br />street maintenance program planning <br />identify altenative to seal coating, identify areas for mill and patch,  <br />identify areas for crack seal, identfy parking lot maintenance  <br />approach <br />Low 2016 <br />Goal Work Tasks Priority Notes <br />Storm Pond Maintenance program Identify subwatersheds, determine land use and soils, determine time  <br />of concentration, gather pond depth, calculate pond effectiveness Medium 2016 <br />CityWide ‐ Stormwater BMP study prioritize need for storm water quality treament for each  <br />subwatershed to assist in decision making process on funding Medium 2016 <br />Karth Lake BMP #1 <br />obtain topography, design improvement, watershed plan review,  <br />apply for funding, assemble bid package, obtain bids, inspect  <br />construction, process payment <br />Medium 2017 <br />Repair outfals inspect outfall, prioritize repairs, identify repairs Medium 2017 <br />pond testing identify ponds in need of dredging, obtain geotechnical samples and  <br />analzsis Medium 2016 <br />pond maintenance funding <br />investigate what other cities are doing to fund pond maintenenace,  <br />project pond maintenace cost needs, identify funding capacity of  <br />surface water management fee <br />Low 2017 <br />MS4 permit Administration <br />conduct annual meeting, submit annual report, inspect outfalls,  <br />inspect water bodies, conduct public education, administer erosion  <br />control plan review and permits, administer ilicit discharg detection  <br />program <br />High 2016 <br />City Code update, surface water Update language on surface water management fund and how fees  <br />are determined High 2016 <br />Update Local Water Management plan Update local water management plan to coordinate with RCWD,  <br />needed for comprehensive plan update in 2018 Medium 2017 <br />Goal Work Tasks Priority Notes <br />North tower ‐ water tower repainting Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment High 2017 <br />Valve replacement Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment High 2016 <br />hydrant replacement Assess condition, identify repairs needed, estimate costs, obtain  <br />quotes, award work, inspect contruction, process payment Medium 2017 <br />C.R. E2 water replacement / Old Hwy 10  <br />water loop <br />assess need for loop, identify area of watermain break problems,  <br />assemble bid package, award bid, inspect construction, process  <br />payment <br />Medium 2017 <br />watermain policy ‐ flushing <br />assess needs and benefit of flushing, collect information on other  <br />city's policies, develop policy, implement policy, develop mapping ,  <br />train public works employees <br />Medium 2017 <br />watermain policy ‐ valves <br />assess needs and benefit of valve excercising, collect information on  <br />other city's policies, develop policy, implement policy, develop  <br />mapping train public works employees <br />Medium 2017 <br />watermain policy ‐ lining technology <br />research watermain lining technologies and their applications, assess  <br />application on the water system, estimate costs, use as needed and  <br />as funding allows <br />Low 2017 <br />City Coade Update, Watermain Update languge on ownership of water services High 2017 <br />Update Water Supply Plan conduct review of system, prepare update to water supply plan,  <br />obtain appoval of update High 2016 <br />Water Tower monitoring system assess performance of existing system, look at alternative system Medium 2016 <br />Surface Water <br />Watermain