Laserfiche WebLink
<br />City of Arden Hills <br />City Council Meeting for April 25, 2016 <br />P:\Planning\Planning Cases\2016\PC 16-003 - Arden Square Master & Final PUD - 1160 County Road E\Memos_Reports_16-003 <br />Page 2 of 8 <br />brick masonry coverage, and adding awnings and decorative lighting. The applicant has provided <br />photographs of this work in Attachment A. <br /> <br /> <br />1. Overview of Request <br /> <br />The proposed site improvements would modify the property’s drive lanes and parking stalls for a <br />more efficient use of space. The existing parking area on the north side of the building would be <br />rearranged to include two one-way drive aisles and angled parking stalls. One drive-up lane on <br />the west side of the building would be retained while the remaining lanes would be removed and <br />replaced with parking. As a result of the project, the overall parking lot area would expand by <br />2,182 square feet and 21 additional parking stalls would be constructed. Other site modifications <br />would include a new monument sign, a trash enclosure constructed with decorative rock face <br />concrete block, bicycle racks, and updated pavement and sidewalk surfaces. Landscaping on the <br />property would be enhanced as well with additional tree and perennial plantings at the County <br />Road E entrance driveway and new parking lot landscape islands. <br /> <br />The project will require a separate permit from the Rice Creek Watershed District (RCWD) <br />because of the increase in impervious surface coverage. Arden Square will improve existing <br />stormwater management on the site to comply with RCWD regulations on rate control and water <br />quality. This would be accomplished with a new subsurface basin and EcoStorm Plus structure <br />that will capture the majority of the runoff from the property and allow for a slower release of <br />stormwater into the City’s sewer system. Currently, the property does not include any rate <br />control or water quality facilities to manage runoff. A memo from the City Engineer addressing <br />the proposed system is included in Attachment E. <br /> <br />The applicant has provided a project narrative explaining the proposed work in more detail and <br />areas where flexibility from the City Code is needed (Attachment A). The proposed site, <br />landscaping, and stormwater management plans are included in Attachment C. <br /> <br /> <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Special Requirements for the B-2 General Business District in Section 1320.085 of the <br />Zoning Code state that Site Plans approved for properties before November 24, 2008 will remain <br />in effect, but that the PUD process will be used for any future site amendments. In this case, a <br />Master and Final PUD are required for the proposed site modifications. <br /> <br />The PUD process is a tool that provides additional flexibility for development that an underlying <br />zoning district would not otherwise allow. For example, a PUD may make exceptions to <br />setbacks, lot coverage, parking requirements, signage, building materials, or landscaping <br />requirements. It is intended to overcome the limitations of zoning regulations and improve the <br />overall design of a project. While the PUD process allows the City to negotiate certain aspects of