My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
04-25-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2016 9:29:28 AM
Creation date
4/22/2016 4:34:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – April 6, 2016 6 <br /> <br />Chair Thompson requested the applicant come forward to address questions from the Planning <br />Commission. <br /> <br />Andrew Commers, Commers Company, introduced himself to the Commission noting that his <br />father owned the building. <br /> <br />Kathy Anderson, President of Architectural Consortium, explained she was the architect for the <br />project. <br /> <br />Chair Thompson requested further information from the applicants regarding the proposed <br />stormwater system. <br /> <br />Ms. Anderson explained that the stormwater runoff was currently running through the parking <br />lot without treatment. She indicated the new plan for the site would be to have the runoff treated <br />underground before it is released into the City’s system. She provided further comment on how <br />the underground chamber treatment system would work. She discussed how traffic would <br />circulate through the site. She commented that the improvements being made to the site were <br />being done to attract high quality tenants. Ms. Anderson believed the monument sign should be <br />located on the east end of the property at the requested height in order to properly meet the needs <br />of the future tenants and to have visibility from Lexington Avenue. <br /> <br />Commissioner Lambeth asked if the sign would be illuminated. <br /> <br />Ms. Anderson stated this was the case. <br /> <br />Chair Thompson opened the public hearing at 7:48 p.m. <br /> <br />Chair Thompson invited anyone for or against the application to come forward and make <br />comment. <br /> <br />There being no additional comment Chair Thompson closed the public hearing at 7:49 p.m. <br /> <br />Commissioner Bartel questioned how much water would be held in the underground retention <br />system. <br /> <br />Senior Planner Bachler was uncertain as to the specific size of the system. He understood that <br />the Rice Creek Watershed District would require the property to put in place a system that will <br />allow for the proper treatment of water runoff for a range of rain events. The City Engineer did <br />not have any concerns with the design of the system. <br /> <br />Commissioner Jones stated he was not comfortable with the size of the sign or the proposed <br />location. <br /> <br />Commissioner Neururer agreed. <br /> <br />Chair Thompson appreciated the explanation from the applicant as to why the sign was located <br />on the eastern corner. However, she agreed the proposed location was confusing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.