Laserfiche WebLink
Page 2 of 2 <br /> <br /> <br />The contract includes installation of both contractor supplied equipment and city <br />purchased equipment. The city has been working to standardize lift station components <br />with upgrades over the last 5 years. As a part of this process we have reconstructed lift <br />stations 1, 12 and 13 with this model of city supplied pumps and controls. Staff is <br />recommending that the same process be utilized in this reconstruction. The next item on <br />the council agenda this evening is approval of a quote from Electric Pump for the pumps <br />and control panel that will be installed by this contractor. The total cost of this lift station <br />rehabilitation, $276,279.00 is the amount of this contact, $214,250.00 plus the cost of the <br />city supplied equipment $62,029.00. Bolton & Menk had estimated a construction cost <br />of this project to fall in the range of $250,000 to $300,000, the combined total cost of <br />construction and owner supplied equipment falls right in the middle of this range. The <br />project will be funded by the Sanitary Sewer Utility Fund <br /> <br /> <br />Attachments <br /> <br />Attachment A: CIP sheet <br />Attachment B: Bolton & Menk memo <br />Attachment C: Resolution 2016-0014