My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-31-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
05-31-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 3:26:30 PM
Creation date
5/27/2016 3:21:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10062 Flanders Court NE, Blaine, MN 55449 - Phone: (763) 780-0450 - Fax: (763) 780-0452 <br /> <br /> <br />May 23, 2016 <br />File No. 170025E-0071 <br /> <br /> <br />Honorable Mayor and City Council <br />City of Arden Hills <br />1245 Highway 96 W <br />Arden Hills, MN 55112 <br /> <br />RE: 2015 PMP IMPROVEMENTS PROJECT <br /> PARTIAL PAY ESTIMATE #7, CHANGE ORDER #3 <br /> <br />Dear Council Members: <br /> <br />Please find attached 3 copies of Partial Pay Estimate No. 7 for the above-referenced <br />project. As you are aware, the Contractor for the project is Valley Paving, Inc. The total <br />amount earned by the Contractor on this partial pay estimate is $3,843,479.68. <br />Subtracting 5% retainage of $192,173.98 and previous payments in the amount of <br />$3,525,742.90, the amount due the Contractor is $125,562.80. <br /> <br />Please also find attached Change Order Number 3. As part of the construction project <br />the Contractor was required to complete some maintenance within the existing rain <br />water garden at Valentine Park. As part of this work it was determined that the garden <br />was not filtrating water as quickly as desired and so another segment of drain tile was <br />added to augment the existing tile that has been in place since the installation of the <br />garden. It was also determined that the compost material needed to be replaced on a <br />portion of the garden to improve the infiltration characteristics of the soil. The change <br />order is in the amount of $31,407.08. The total project cost is still lower than the bid <br />amount. <br /> <br />This pay estimate includes payment for final quantities from work completed last year. <br />There will be some additional quantities for restoration work that is currently being <br />completed this spring. We have inspected the work performed by Valley Paving, Inc. <br />and find it to be in compliance with the plans, specifications, and contract documents. <br />Therefore we would recommend approval of Partial Pay Estimate No. 7 in the amount of <br />$125,562.80. <br /> <br />If you have any questions regarding this issue please feel free to call. <br /> <br />Sincerely, <br /> <br />ELFERING & ASSOCIATES <br /> <br /> <br /> <br />Kristie Elfering, P.E. <br />Project Engineer <br /> <br />cc: John Anderson, Interim Public Works Director
The URL can be used to link to this page
Your browser does not support the video tag.