Laserfiche WebLink
PARTIAL PAY ESTIMATE #7 <br />FROM: <br />TO: <br />CONTRACTOR:Valley Paving, Inc <br />ADDRESS:8800 13th Avenue E Shakopee, MN 55379 <br />OWNER:City of Arden Hills, MN <br />PROJECT: <br />SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT <br />October 31, 2015 ORIGINAL:3,896,796.88$ <br />REVISED:3,839,381.40$ <br />ITEM <br />NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE QTY. TOTAL PRICE QTY. TOTAL PRICE <br />SCHEDULE 1.0 - STREET (GRANT/NOBLE) <br />1 2021.501 MOBILIZATION LS 1.00 52,200.00 0.00 $0.00 1.00 $52,200.00 <br />2 2101.502 CLEARING TREE 8.00 255.00 4.00 $1,020.00 10.00 $2,550.00 <br />3 2101.507 GRUBBING TREE 8.00 113.00 4.00 $452.00 10.00 $1,130.00 <br />4 2104.505 REMOVE CONCRETE PAVEMENT SY 625.00 8.50 0.00 $0.00 1,192.37 $10,135.15 <br />5 2104.505 REMOVE BITUMINOUS PAVEMENT SY 14,160.00 2.88 468.00 $1,347.84 14,160.00 $40,780.80 <br />6 2104.523 SALVAGE SIGN EACH 25.00 25.60 0.00 $0.00 18.00 $460.80 <br />7 2104.523 SALVAGE MAILBOX EACH 79.00 61.50 5.00 $307.50 65.00 $3,997.50 <br />8 2104.511 SAW CUT CONCRETE (FULL DEPTH) LF 1,440.00 2.82 543.00 $1,531.26 1,001.00 $2,822.82 <br />9 2104.513 SAW CUT BITUMINOUS (FULL DEPTH) LF 900.00 2.00 459.00 $918.00 1,182.00 $2,364.00 <br />10 2105.501 COMMON EXCAVATION (P) CY 7,815.82 14.50 0.00 $0.00 7,815.82 $113,329.39 <br />11 2105.507 SUBGRADE EXCAVATION CY 580.00 14.50 0.00 $0.00 758.00 $10,991.00 <br />12 2105.522 SELECT GRANULAR BORROW (CV) CY 580.00 24.00 309.29 $7,422.96 664.29 $15,942.96 <br />13 2105.525 TOPSOIL BORROW CY 1,000.00 28.00 228.00 $6,384.00 1,220.00 $34,160.00 <br />14 2105.604 GEOTEXTILE FABRIC TYPE V SY 1,750.00 0.85 0.00 $0.00 972.00 $826.20 <br />15 2211.501 AGGREGATE BASE, CLASS 7 TON 6,250.00 0.01 0.00 $0.00 6,361.00 $63.61 <br />16 2211.501 AGGREGATE BASE, CLASS 7 (DRIVEWAY) TON 650.00 17.40 0.00 $0.00 715.00 $12,441.00 <br />17 2232.501 MILL BITUMINOUS PAVEMENT SY 60.00 6.75 0.00 $0.00 60.00 $405.00 <br />18 2331.603 BITUMINOUS JOINT CONTROL LF 2,730.00 2.33 1,966.00 $4,580.78 3,125.00 $7,281.25 <br />19 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 565.00 2.00 410.00 $820.00 565.00 $1,130.00 <br />20 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE TON 1,150.00 64.15 280.00 $17,962.00 1,374.00 $88,142.10 <br />21 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (TRAIL) TON 15.00 105.00 39.00 $4,095.00 87.00 $9,135.00 <br />22 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (DRIVEWAY) TON 30.00 105.00 0.00 $0.00 118.00 $12,390.00 <br />23 2360.501 TYPE SP 12.5 NONWEARING COURSE MIXTURE TON 1,500.00 62.70 -328.00 ($20,565.60) 969.00 $60,756.30 <br />24 2504.601 IRRIGATION REPAIR EACH 10.00 100.00 -2.00 ($200.00) 10.00 $1,000.00 <br />25 2531.501 CONCRETE CURB & GUTTER B618 LF 8,100.00 10.10 25.00 $252.50 8,069.00 $81,496.90 <br />26 2531.511 4" CONCRETE WALK SF 210.00 5.43 156.29 $848.65 359.29 $1,950.94 <br />27 2531.511 CONCRETE PAVEMENT (6" THICK) SF 11,310.00 4.41 92.00 $405.72 11,964.85 $52,764.99 <br />28 2531.511 CONCRETE PAVEMENT (SPECIAL) (6" THICK) SF 300.00 12.71 13.00 $165.23 28.00 $355.88 <br />29 2531.618 TRUNCATED DOMES SF 48.00 41.00 0.00 $0.00 68.00 $2,788.00 <br />30 2540.603 LANDSCAPE EDGER, PLASTIC (REPLACEMENT) LF 400.00 5.00 0.00 $0.00 0.00 $0.00 <br />31 2563.601 TRAFFIC CONTROL LS 1.00 4,510.00 0.00 $0.00 1.00 $4,510.00 <br />32 2564.531 F & I SIGN PANEL SF 150.00 32.80 0.00 $0.00 92.00 $3,017.60 <br />33 2564.602 F & I SIGN POST EACH 16.00 97.40 0.00 $0.00 15.00 $1,461.00 <br />34 2573.502 SILT FENCE TYPE MACHINE SLICED LF 465.00 3.20 427.50 $1,368.00 1,015.00 $3,248.00 <br />35 2573.520 SEDIMENT REMOVAL BACKHOE HR 20.00 50.00 0.00 $0.00 0.00 $0.00 <br />36 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 3.00 40.00 0.00 $0.00 3.00 $120.00 <br />37 2573.607 ROADWAY ROCK CHECK DAM CY 100.00 31.00 0.00 $0.00 39.27 $1,217.37 <br />38 2575.512 MULCH MATERIAL, TYPE SPECIAL CY 140.00 55.00 0.00 $0.00 0.00 $0.00 <br />39 2575.604 SEEDING (TYPE 25-151) SY 9,000.00 1.28 0.00 $0.00 5,760.00 $7,372.80 <br />40 2575.607 LANDSCAPE ROCK CY 30.00 100.00 0.00 $0.00 0.00 $0.00 <br />41 SPEC DENSITY TEST EACH 25.00 80.00 0.00 $0.00 0.00 $0.00 <br />42 SPEC PROCTOR TEST EACH 3.00 155.00 0.00 $0.00 1.00 $155.00 <br />43 SPEC GRADATION TEST EACH 3.00 140.00 0.00 $0.00 3.00 $420.00 <br />44 SPEC AIR VOIDS EACH 6.00 255.00 0.00 $0.00 0.00 $0.00 <br />November 7, 2015 <br />February 29, 2016 <br />2015 PMP Improvements <br />THIS PERIOD <br />ORIGINAL: <br />REVISED: <br />ORIGINAL CONTRACT TOTAL TO DATE <br />1