Laserfiche WebLink
AGENDA ITEM – 9C <br /> <br />City of Arden Hills <br />City Council Meeting for June 27, 2016 <br /> <br />P:\Planning\Planning Cases\2016\PC 16-014 - Land O' Lakes - PUD\Memos_Reports_16-014 <br />Page 5 of 14 <br />C. Building Height – Meets Requirements <br /> <br />The maximum building height within the I-1 – Limited Industrial District Zoning District is <br />35 feet. During Phase 1 of the project no additional structures will be constructed on the site. <br />Flexibility in building height will be required for Phase 2 of the project as a building height <br />of approximately fifty-six (56) feet is being suggested at this time. The original PUD that <br />was approved in 1979 in Planning Case 79-004 permitted the east building to be constructed <br />at a height of fifty-six (56) feet. <br /> <br /> Zoning Code Existing Proposed Phase 1 Future Phase 2 <br />Building Height 35’ 56’ --* 56’ <br />*No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 <br />of the project suggests a new 4 story office structure at approximately 56 feet in height. <br /> <br />D. Setbacks – Meets Requirements <br /> <br />The minimum building setbacks in the I-1 – Limited Industrial District include a 55 foot <br />front yard setback, 20 foot rear yard setback, 20 foot side yard setbacks, and a 50 foot side <br />yard corner setback where applicable. Although Phase 1 of the project does not include any <br />new structures, the Master PUD and future Phase 2 of the project includes a new office <br />building. As proposed, the new structure proposed in Phase 2 of the Master PUD will meet <br />all setback requirements. <br /> <br /> Permitted Existing Proposed Phase 1 Future Phase 2 <br />Front Yard Setback 55’ 400’ --* 390’ <br />Rear Yard Setback 20’ 436’ --* 436’ <br />Side Yard Setback (East) 20’ 103’ --* 103’ <br />Side Yard Setback (West) 20’ 561’ --* 561’ <br />Side Yard Corner (East) 50’ 619’ --* 619’ <br />*No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of the <br />project suggests a new 4 story office structure. <br /> <br /> <br />Section 1325 – General Regulations <br /> <br />A. Tree Preservation – Meets Requirements <br /> <br />The applicant submitted a Tree Survey and Tree Replacement Plan as part of their tree <br />preservation and mitigation requirements (Attachment B). The following table outlines these <br />numbers and the additional requirements of the tree preservation ordinance pertaining to tree <br />removal and tree mitigation regulations. <br />