Laserfiche WebLink
<br />9 <br />188032v2 <br />requirements enacted after the date of this Agreement with respect to property which did not receive <br />development approval less than two (2) years prior to any such amendments. <br /> 5. IMPROVEMENTS. Developer shall install and pay for the following as required to be <br />built within the Development as private improvements in accordance with the approved Project Plans: <br /> A. Sanitary Sewer System <br /> B. Water System <br /> C. Storm Sewer System <br /> D. Parking Lots <br /> E. Streets, and Driveways <br /> F. Concrete Curb and Gutter <br /> G. Street lights <br /> H. Site Grading, STORMWATER MANAGEMENT FACILITIES, and Erosion Control <br /> I. Landscaping <br /> J. Underground Utilities <br /> K. Setting of Iron Monuments, including Monuments described in the Wetland Overlay <br />District <br /> L. Surveying and Staking <br /> M. Sidewalks and Trails <br /> N. Traffic Control Signs <br /> O. Open Space Amenities, Childcare Playground, and other Outdoor Areas <br />The improvements shall be installed in accordance with the City of Arden Hills Code of Ordinances (the <br />“City Code”). The Developer shall submit plans and specifications for permit which have been prepared by <br />a competent registered professional engineer to the City for approval by the City Engineer which approval <br />shall be provided on the condition that such submittals comply with the Project Plans and this Agreement. <br />The City may, at the City's discretion and at the Developer's expense, have one (1) or more City inspectors <br />and a soil engineer inspect the work as the City may reasonably determine. The Developer, its contractors <br />and subcontractors, shall follow all instructions received from the City's inspectors. The Developer's <br />engineer shall provide for on-site project management. The Developer's engineer is responsible for design <br />changes and contract administration between the Developer and the Developer's contractor. The Developer