My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
07-11-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 10:32:26 AM
Creation date
7/11/2016 10:28:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 <br />188032v2 <br />or his engineer. The Developer shall schedule a pre-construction meeting at a mutually agreeable time at <br />the City Council chambers with all parties concerned, including the City staff, to review the program for the <br />construction work. <br /> 6. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction <br />required by this Agreement, the improvements lying within public easements shall become property pf the <br />City without further notice or action. Within thirty (30) days after completion of the public improvements, <br />the City shall inspect the public improvements and notify the Developer if any of the improvements do not <br />conform to the requirements of this Agreement and the Developer shall address all non-conformities. <br />Within thirty (30) days after the City determines that the public improvements conform to the requirements <br />of this Agreement, the City shall give formal notice of acceptance to the Developer and thereafter the <br />Developer shall have no responsibility with respect to the maintenance of the public improvements, except <br />during the warranty periods. discussed below. <br /> 7. WARRANTY. The Developer shall cause its general construction contractor to warrant to <br />the Developer and to the City that the materials used for the public improvements will be of good quality <br />and new unless the Project Plans require or permit otherwise, and that the public improvement work will <br />conform to the requirements of this Agreement and will be free from defects, except for those inherent <br />therein. All trees and shrubs shall be warranted to be alive, of good quality, and disease free for twenty-four <br />(24) months after planting. Any replacements shall be warranted for twenty-four (24) months from the time <br />of planting. <br /> 8. PERMITS. Developer shall obtain or require its contractors and subcontractors to obtain <br />all necessary permits, including but not limited to the following to the extent required: <br />• Ramsey County for County Road Access and Work in County Rights-of-Way <br />• MnDot for State Highway Access <br />• Minnesota Department of Health for Watermains <br />• MPCA for Storm Water Issues, Sanitary Sewer and Hazardous Material Removal and <br />Disposal <br />• DNR for Dewatering <br />• City of Arden Hills for Building Permits and Grading and Erosion Control Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.